A.
In order to obtain approval to construct or change the size or location of a fire pipe connecting to a public water main, the owner shall submit an application. The application shall be supplemented by a building site plan approved by the City, and by such other permits, plans, specifications, and information as the City may require. Approval of the application shall be subject to the public water system capacity in the public water main as determined by the DPW (or designee). Any application issued shall be void and invalid unless the work authorized by it shall have been commenced within 180 days after issuance; however, for cause shown and upon written request by the property owner, an extension may be granted by the DPW (or designee).
B.
All costs and expenses incident to the completion of an application and the work authorized pursuant to such application, including but not limited to design, construction, connection, and inspection of a fire pipe shall be borne by the owner.
C.
Water supplied through a fire pipe shall be for fire protection only, except for annual fire pump tests. Only prior written authorization from the City shall permit any other use of water from a fire pipe. No water used for fire protection/suppression systems shall be taken from a water service pipe.