The gas lines constructed under this article shall conform to the specifications of the Texas Railroad Commission and to the recommendations of the city engineer and director of public works, in the design, size and layout of the gas distribution system. The natural gas line shall be acceptable, without penalty, to the Texas Railroad Commission and shall be approved by the city engineer and the director of public works. All materials and installations for natural gas lines shall be in accordance with the railroad commission's standards and the city standards for same and shall be approved by the railroad commission and by the director of public works and by the city engineer.
(Ordinance 1431, § 2, 5-13-08; Ordinance 1486, § 2, 12-1-09)