The City shall prepare an initial study which complies with Section 15063 of the CEQA Guidelines. If the City determines that an EIR will clearly be required for the project, an initial study is not required but may still be desirable.
(§ 1, Ord. 2684 c.s., eff. April 17, 1993, as amended by § 6, Ord. 3125 c.s., eff. January 16, 2015)