A.
No regulated earth disturbance activities within the Township shall commence until approval by the Township of BMP operations and maintenance plan which describes how the permanent (e.g., postconstruction) stormwater BMPs will be properly operated and maintained.
B.
The following items shall be included in the BMP operations and maintenance plan:
(1)
Map(s) of the project area, in a form that meets the requirements for recording at the offices of the Recorder of Deeds of Montgomery County, and shall be submitted on twenty-four-inch-by-thirty-six-inch or thirty-inch-by-forty-two-inch sheets. The contents of the maps(s) shall include, but not be limited to:
(a)
Clear identification of the location and nature of permanent stormwater BMPs;
(b)
The location of the project site relative to highways, municipal boundaries or other identifiable landmarks;
(c)
Existing and final contours at intervals of two feet, or others as appropriate;
(d)
Existing streams, lakes, ponds or other bodies of water within the project site area;
(e)
Other physical features, including flood hazard boundaries, sinkholes, streams, existing drainage courses and areas of natural vegetation to be preserved;
(f)
The locations of all existing and proposed utilities, sanitary sewers and water lines within 50 feet of property lines of the project site;
(g)
Proposed final changes to the land surface and vegetative cover, including the type and amount of impervious area that would be added;
(h)
Proposed final structures, roads, paved areas and buildings; and
(i)
A fifteen-foot wide access easement around all stormwater BMPs that would provide ingress to and egress from a public right-of-way.
(2)
A description of how each permanent stormwater BMPs will be operated and maintained and the identity of the person(s) responsible for operations and maintenance;
(3)
The name of the project site, the name and address of the owner of the property, and the name of the individual or firm preparing the plan; and
(4)
A statement, signed by the landowner, acknowledging that the stormwater BMPs are fixtures that can be altered or removed only after approval by the Township.