No home or business shall take occupancy of a building until a certificate of occupancy is completed. Failure to obtain a certificate of occupancy prior to occupying the home shall result in fines, disconnection of water and sewer, revocation of building permit(s), and/or a revocation of business license(s).
Landscaping shall be complete at the time of a final inspection. The Building Official shall ensure that all landscaping is in place at the time of final inspection. Failure to have landscaping complete or bonding in place at the time of final inspection will result in a denial of the final inspection and the house will be deemed incomplete.
The Planning Director may require bonding if the Director finds the quality of the landscaping or conditions poor enough to threaten the viability of the landscaping.
The Planning Director may require additional bids if the Director believes the bids submitted are not within a reasonable range of likely costs.
(Ord. 2010-04 §1; Ord. 2010-15 §1)
The bond shall be in the amount of 110% of the cost selected.
(Ord. 2010-04 §1; Ord. 2010-15 §1)
The Planning Director may request the landscaping to be completed by a date certain as weather permits. Failure to complete the landscaping within 15 days of the specified date shall allow the Planning Director to use the bond to complete the project.