All debris generated from construction sites within the City shall be removed from the site before a certificate of final action and/or a certificate of occupancy are issued for the structure or structures located on the construction site. The term "debris" shall include but not be limited to stumps, tree limbs, brush, discarded building materials, and other waste materials generated by the construction process.
(Ord. 2010-04 §1; Ord. 2010-15 §1)