All work shall be unconditionally guaranteed by the permittee against defects for one year from the date of completion.
If within the guarantee period, repairs are required in connection with the work which, in the opinion of the Director, is necessary as the result of the use of materials, equipment, or workmanship which are inferior, defective, or otherwise not in accordance with the terms of the permit, the permittee shall, promptly upon receipt of notice from the City, and without expense to the City, place in satisfactory condition in every particular, all work correcting all defects therein; make good all damage to structures, the site, plantings, or work disturbed in fulfilling the guarantee. Defects to be corrected by the permittee shall include, but are not limited to, broken or damaged pipe, infiltration or exfiltration, offset pipe joints, variations from the planned line and grade which in the opinion of the City affect the serviceability or maintenance of the system. Subsidence of surfaced and unsurfaced sewer line trench backfill shall be considered as a defect in workmanship. Correction of any such defects will be made by the permittee at no cost to the City.
(Ord. 249 § 537, 1979; Ord. 559 § 1, 2017)