Before commencing any improvements the subdivider shall deposit with the city clerk the sum estimated by the city engineer to cover the actual cost of the engineering or inspection charges rendered in connection with the improvements, as follows:
(1)
For checking of plans, profiles, details and specifications;
(2)
For preparation of plans, profiles, details and specifications;
(3)
For setting construction line and grade stakes, supervision and inspection of construction; and
(4)
For inspection and supervision of construction; provided, however, that if approved by the city engineer, the subdivider may engage the services of an engineer who is a registered civil engineer of the state to prepare plans, profiles, details and specifications, or for setting construction line and grade stakes, however, in such an event all checking of plans, profiles, details and specifications, and all inspection and supervision of the improvements shall be performed by the city engineer.
(Prior code § 18.6)