The fees for a permit to operate shall be considered as inspection fees for the initial annual inspection of a labor camp. When any reinspection is required pursuant to Title
25, California Administrative Code, Section 2016.4, the operator shall pay a fee for each such reinspection, as follows:
A. Twenty-five dollars provided that such inspection is not in excess of one hour in duration.
B. If such inspection is in excess of one hour in duration, $25.00 plus $12.50 for each 30 minutes or fractional part thereof in excess of one hour.
(1970-4/75, 2035-3/76)