A.
All derricks and portable masts used for drilling or reworking shall meet the standards and specifications of the American Petroleum Institute as they presently exist or may be amended hereafter.
B.
All drilling, redrilling or reworking equipment shall be removed from the operation site within 30 days following the completion of drilling, redrilling or reworking unless otherwise permitted by the DOGGR.
(3037-5/90, 4138-10/17)
