New 1- & 2-Family Dwellings
| |
Application
|
$50
|
Plan review
|
$400 + $200 each additional review after 2nd
|
Revised plan review
|
$200
|
Building permit
|
$1.10 per sf under roof
|
T-Pole
|
$100
|
Irrigation
|
$185
|
Fence
|
$75
|
Expired permits/refund
|
50% refund on permit fee if prior to work beginning
|
Reinspection
|
$100 per failed inspection after 2nd failed inspection
|
Unauthorized cover-up/skipped inspection
|
$200 (doubles for every offense on same project)
|
Paid same day inspection
|
$150 (requested and paid for before 8:00 a.m.)
|
Reinstatement of expired permit
|
25% (same plan) or 50% (revised) of original fee
|
Administrative fee
|
$20 per MEP sub-swap (on BLDSF projects only)
|
Parkland dedication
|
1 acre each 50 lots (or $3 per sf of land of that acreage or
appraisal)
|
Park improvement
|
$1,500 per unit
|
Building activity
|
$600 per building
|
Technology
|
$500 if/when applicable
|
Outdoor warning device
|
$40 per unit (SF)
|
Capital recovery fees
|
If/when applicable
|
Impact fees
|
See impact fee chart (may vary with agreement)
|
Residential Remodels and Additions
| |
Application
|
$50
|
Plan review
|
$125 + $125 each additional review after 2nd
|
Building permit fee
|
$0.65 per sf under roof ($200 minimum)
|
Building fee
|
$100 per (MEP)
|
Reinspection fee
|
$100 per failed inspection after 2nd failed inspection
|
Working without permit
|
Double the permit fee (2nd offense is 3x the cost)
|
Residential Building Permits - Mechanical, Electrical, Plumbing
| |
Building permit - mechanical
|
$100
|
Building permit - electrical
|
$100
|
Building permit - plumbing
|
$100
|
Working without a permit
|
Double the permit fee (2nd offense is 3x cost)
|
Residential Miscellaneous Permits (Minor Permits)
| |
Application fee
|
$50
|
Plan review fee
|
$100 ($200 per second and beyond)
|
After hours inspection
|
$80 per hour (4-hour minimum)
|
Temporary gas and electric inspection
|
$100
|
Paid same day inspection
|
$150 (before 8:00 a.m.)
|
Demolition or foundation repair
|
$100
|
Curb cut/driveway/flatwork
|
$100
|
Fence
|
$50
|
Solar panel/storm shelter/windows
|
$100
|
House moving
|
$400
|
Irrigation
|
$185
|
Backflow installation
|
$75
|
Manufactured home
|
$100 + trades ($100 each)
|
Accessory structures (patio covers, decks, outdoor kitchens,
detached garages, shade structures, carports, fire pits, etc.)
|
$250 per structure
|
Pool/spa
|
$250 (major)/$100 (minor)
|
Generator
|
$100
|
Refund policy
|
50% of permit fee when no work has been done
|
Re-inspection fee
|
$100 per failed inspection after 2nd failed inspection
|
Retaining wall
|
$100
|
Roof/roof repair
|
$100
|
Simple grading - single lot
|
$75
|
T-pole
|
$75
|
Unauthorized cover-up/skipped inspection
|
$200 (doubles for every offense on same project)
|
Water well drilling
|
$100
|
Work without permit fee
|
Double the permit fee
|
New Commercial and Multifamily
| |
Application
|
$225
|
Plan review
|
50% of building permit fee for projects valued at $3,000,000
or less, 25% of permit fee for projects valued greater than $3,000,000,
or amount as required by 3rd party review
|
Fourth (or more) plan review fee
|
$1,000 + $1,000 for each additional round
|
Revised plan check fee
|
50% of original plan review fee
|
Minor plan revision
|
$500
|
Paid same day inspection
|
$150 (before 8:00 a.m.)
|
Unauthorized cover-up/skipped inspection
|
$500 (doubles for every offense on same project)
|
Commercial building permit
|
Current ICC sf construction costs table fee for appropriate
construction type (gross area X sf construction cost X permit fee
multiplier (.0075) = permit fee
|
Multifamily building permit
|
$0.90 per sf under roof
|
Reinspection
|
$100 per each inspection after 2nd failed inspection
|
Building fee (M.E.P.)
|
$0.06 per square foot (minimum $100)
|
Outdoor warning device
|
$14 per unit
|
T-Pole
|
$150
|
Building activity
|
$500 per building
|
Technology
|
$50 (per multifamily unit)
|
Parkland dedication fee
|
$500 per unit (when applicable)
|
Park improvement fee
|
$1,000 per unit (when applicable)
|
Certificate of occupancy (CO)
|
$250
|
Temporary CO
|
$300 every 30 days
|
Impact fees (water, sewer, roadway)
|
See impact fee chart
|
Tenant Finish-Out and Remodel Miscellaneous Commercial and Multifamily
| |
Application
|
$200
|
Plan review
|
50% of building permit fee for projects valued at $3,000,000
or less, 25% of permit fee for projects valued greater than $3,000,000,
or amount as required by 3rd party review
|
Fourth (or more) Plan Review
|
$500 (escalates by $100 each time thereafter)
|
Minor plan revisions
|
$500 (50% of original plan review fee for major revisions)
|
Paid same day inspection
|
$150 (before 8:00 a.m.)
|
Commercial building permit
|
$8 per $1,000 in value ($200 minimum)
|
Multifamily building permit
|
$0.44 per square foot
|
Building fee (M.E.P.)
|
$0.06 per square foot ($75 minimum)
|
Clean & show/meter release
|
$75
|
Demolition
|
$100
|
Re-roof
|
$100 permit (per building)
|
Commercial pool
|
$500 + trades minimum
|
Curb cut/driveway/flatwork
|
$100
|
Retaining wall/screen wall/fence
|
$6 per $1,000 valuation ($100 minimum)
|
T-pole
|
$150
|
Temporary trailer
|
$200 + trades minimum
|
Temporary batch plant
|
$350
|
Unauthorized cover-up/skipped inspection
|
$250 (doubles for every offense on same project)
|
Refund policy
|
80% the permit fee (only when no work has been done); 50% when
work has been done
|
Reinspection policy
|
$100 per inspection
|
Working without a permit
|
Double the permit fee
|
After hours inspection
|
$80 per hour (4-hour minimum)
|
Certificate of occupancy (CO)
|
$125
|
Temporary CO
|
$300 every 30 days (escalates)
|
Annual Contractor Registration
| |
Mechanical, electrical, plumbing contractor
|
No charge per state law
|
General contractor
|
$100
|
Irrigator contractor
|
$100
|
Sign contractor
|
$100
|
Right-of-way contractor
|
$100
|
Utility franchise contractor
|
No charge
|
Working without permit fee
|
Double the permit fee and re-register as a contractor
|
Signs/Promotional Event Permits
| |
Wall sign or miscellaneous
|
$150 application + $50 permit + $75 electrical (if applicable)
|
Monument sign
|
$150 application + $100 permit + $75 electrical (if applicable)
|
Banners
|
$50 permit (valid for a 2-week period)
|
Promotional event
|
$50 + $50 food (if applicable)
|