Abandonment | $150 | $10 | $160 |
Annexation | $500 | $10 | $510 |
Appeal (100% refunded if appeal is granted) | $500 | $10 | $510 |
Comprehensive plan amendment | $350 | $25 | $375 |
Construction plans | | | |
Construction plans, subdivision (limits of construction) | $3,099 + $50 per acre/lot over 1 acre/lot/easement area (whichever is greater) | $50 | $3,149 + $50 per acre/lot over 1 acre/lot/easement area (whichever is greater) |
Construction plan revision, minor | $750 | $6 | $756 |
Construction plan revision, major | $2,500 + $50 per acre/lot over 1 acre/lot/easement area (whichever is greater) | $50 | $2,550 + $50 per acre/lot over 1 acre/lot/easement area (whichever is greater) |
Development agreement | | | |
Development agreement | $2,250 (includes 5 hrs. of staff meetings) + additional staff time (at hourly rate to be determined) + related legal fees (at rate billed to the city, minimum $225/hr.) | $50 | $2,300 (includes 5 hrs. of staff meetings) + additional staff time (at hourly rate to be determined) + related legal fees (at rate billed to the city, minimum $225/hr.) |
Development agreement amendment | $500 (includes 5 hrs. of staff meetings) + additional staff time (at hourly rate to be determined) + related legal fees (at rate billed to the city, minimum $225/hr.) | $50 | $550 (includes 5 hrs. of staff meetings) + additional staff time (at hourly rate to be determined) + related legal fees (at rate billed to the city, minimum $225/hr.) |
Driveway access permit | | | |
Agricultural | $100 | $6 | $106 |
Residential | $100 | $6 | $106 |
Nonresidential | $250 | $6 | $256 |
Letter of regulatory compliance (plat certification and zoning verification) | $25 | $6 | $33 |
License to encroach (easement or right-of-way) | $200 | $10 | $210 |
Rezoning | | | |
Rezoning | $500 (1st 5 acres) + $25 per each additional 5 acres (maximum fee $1,000) | $15 | $515 (1st 5 acres) + $25 per each additional 5 acres (maximum fee $1,000) |
Planned development district rezoning | $2,500 (1st 5 acres) + $50 per each additional 5 acres (maximum fee $7,000) | $50 | $2,500 (1st 5 acres) + $50 per each additional 5 acres (maximum fee $7,000) |
PDD amendment | 50% of full application fee | $10 | 50% of full application fee + $10 |
Site development plan | | | |
Site development plan (includes construction plans) (must be submitted together) | $3,500 + $50 per acre over 1 acre | $50 | $3,550 + $50 per acre over 1 acre |
Site development plan amendment | $1,500 | $6 | $1,506 |
Site development plan, minor | $750 | $6 | $756 |
Site development plan extension | $750 | $6 | $756 |
Site development plan reinstatement | $750 | $10 | $760 |
Special use permit | | | |
Special use permit | $750 | $15 | $765 |
Special use permit extension | $50 | $6 | $56 |
Stormwater permit | $1,000 | $10 | $1,010 |
Subdivision plats | | | |
Amending plat | $2,000 | $15 | $2,015 |
Final plat | $2,500 + $25 per acre or lot (whichever is greater) | $25 | $2,525 + $25 per acre or lot** (whichever is greater) |
Minor plat | $1,000 | $15 | $1,015 |
Preliminary plat | $2,500 + $20 per acre or lot (whichever is greater) | $50 | $2,550 + $20 per acre or lot** (whichever is greater) |
Preliminary plat amendment | 50% of full application fee | $10 | 50% of full application fee |
Replat | $2,000 + $20 per acre or lot (whichever is greater) | $50 | $2,000 + $20 per acre or lot** (whichever is greater) |
Subdivision variance (with plat) | $750 | $6 | $756 |
Subdivision variance (without plat) | $750 | $6 | $756 |
Plat extension | $750 | $6 | $756 |
Vacation of recorded plat | $750 | $6 | $756 |
Temporary use permit | $500, $250 for extension | $10 | $510, $260 for extension |
Traffic impact analysis | $250 + engineer review fees at $150/hr. (charged separately, engineer fee will be higher if city billed at higher rate) | $15 | $265 + engineer review fees at $150/hr. (charged separately, engineer fee will be higher if city billed at higher rate) |
Code text amendment (out of cycle) | $350 | $25 | $375 |
Zoning variance | $250 | $15 | $275 |
Resubmission (after 3rd submission) | $750 | – | $750 |
Revisions | | | |
Minor revision | $150 | $6 | $156 |
Minor revision, board or council action | 50% of full application fee | $10 | 50% of full application fee + $10 |
Major revision | Current application fee | $50 | Current application fee + $50 |
Parkland dedication | | | |
One or two dwelling units on a lot or parcel | $200 per unit | – | $200 per unit |
Three or more dwelling units on a lot or parcel | $100 per unit | – | $100 per unit |
Development | | | |
Utility feasibility study | $1,500 | – | $1,500 |
Service availability fee | Water - $1,100 per unit/lot Wastewater - $900 per unit/lot | – | Water - $1,100 per unit/lot Wastewater - $900 per unit/lot |
Re-notices: All application fees include the initial public notice fee, up to 50 mailed notices. For projects with over 50 mailed notices, an additional fee of $1.00 per letter shall be charged for each mailing. Any necessary subsequent public notifications will be charged to the applicant prior to each additional notice at the rate of $75 per type of notice. |