Temporary structures shall be erected for a period of less than
180 days. Temporary structures shall be anchored to prevent flotation,
collapse or lateral movement resulting from hydrostatic loads, including
the effects of buoyancy, during conditions of the base flood. Fully
enclosed temporary structures shall have flood openings that are in
accordance with ASCE 24 to allow for the automatic entry and exit
of floodwaters.
Temporary storage includes storage of goods and materials for
a period of less than 180 days. Stored materials shall not include
hazardous materials.
Temporary structures and temporary storage in floodways shall
meet the requirements of § 120-36A of this chapter.