8.1.1.
This ordinance shall be administered by a Code Official who shall be appointed by the Town Manager. In the absence of the Code Official, this ordinance shall be administered by the Board of Selectmen.
8.1.2.
There shall be no start of construction nor shall any building be enlarged, replaced or altered until a building permit shall first have been obtained from the Code Official. (03/1976)
8.1.3.
Any request for a building permit, in which a permanent structure shall be constructed, shall be accompanied by a certified plot plan unless one is already on file with the Planning Office, Assessor's Office or with the Code Official, in which case a photocopy of the same shall be submitted. All certified plot plans shall bear the stamp of a licensed land surveyor, as required by the New Hampshire Board of Licensure for Land Surveyors. In cases where a septic plan is required, the septic plan may be used as a certified plot plan if a note is included on the plan by the owner of the plan that it may be used for this purpose and it also bears the stamp of a licensed land surveyor. (03/2016)
8.1.3.1.
A permanent structure is one that has, as part of its construction, either a concrete, post, or pier foundation. Examples of permanent structures are homes, additions, garages, barns, pools, commercial or industrial buildings. (03/2002)
8.1.3.2.
Open, nonroofed decks, wheelchair ramps and similar disability access structures and sheds shall be considered nonpermanent, for the purpose of providing a certified plot plan only, when applying for the required building permit. (03/2010)
8.1.3.3.
The certified plot plan shall indicate the location of all permanent buildings, septic systems, well location, driveway(s), and other existing structures such as pools, patios, etc., or in the case of a vacant lot, the lot's boundaries and any permanent existing monumentation. (03/2002)
8.1.3.4.
The plan shall enumerate the exact lot dimensions, acreage, and square footage of the lot calculated to the nearest 1/100 of an acre. (03/2002).
8.1.4.
The Code Official shall receive all applications for construction, erection, or placement of all buildings and for the enlargement of all buildings as provided in this ordinance. He shall issue building permits as applied for upon payment of the required fees if, in his opinion, the application complies with all applicable laws of the State of New Hampshire, this ordinance, and other Town laws and ordinances; provided, however, that in any instance where licenses or permits other than the building permit are required, this building permit shall constitute only an approval upon which the proper authority may issue such licenses or permits, and shall in no way be considered as a substitute or alternative for them.
8.1.5.
Any permit obtained after construction has begun shall be subject to a payment of twice the normal fee. (3/2017)
8.1.6.
The Code Official shall keep the records necessary to submit to the Town a report, monthly, of all permits issued and fees paid.