Townhouse developments shall be approved pursuant to the standards of this chapter and the regulations and procedures established in the platting and subdivision ordinance, as modified below:
A. Review.
1. The creation of five or more lots shall follow the SEPA process.
2. The site plan review committee shall review and approve the creation of nine or fewer subdivided lots. The site plan review committee approval process does not involve a public hearing but will include notification to adjacent property owners. The decision of the site plan review committee is subject to the appeal process as identified in Chapter
20.84 CMC.
3. The planning commission shall review the creation of ten or more subdivided lots as provided for through the regular subdivision process in Chapter
19.12 CMC.
B. Platting.
1. A subdivision or short plat shall be required for all townhouse developments so that individual townhouse units are divided into separate legal lots with common walls located on the lot lines.
2. When a townhouse development is platted, construction of townhouses may commence prior to final plat or final short subdivision approval, provided:
a. The proposed subdivision has received preliminary approval or the short subdivision has received conditional approval, and the necessary legal instruments have been filed to assure construction of required public improvements;
b. Any partial or complete construction of structures shall not relieve the developer from, nor impair city enforcement of, conditions of subdivision approval; and
c. Units may not be rented or sold, nor occupancy permits issued until a final plat or final short plat has been formally approved by the city.
C. Site Plans. An application for a townhouse development shall include a site plan drawing or drawings, at a scale not smaller than one hundred feet to the inch, showing all the information required for a preliminary plat plus the following:
2. Streets bounding or abutting the site;
3. Proposed buildings, including dimensions, setbacks, identification of types, and the number of units;
4. Location and dimensions of open spaces;
5. Location and dimensions of garbage disposal areas;
6. Locations and design of off-street parking facilities, showing their size, landscaping, lighting, and number of spaces;
7. Circulation plan for vehicular and pedestrian access, including points of ingress and egress from the site and their relationship to ingress and egress of neighborhood properties;
8. Existing buildings and an indication of future use or disposition;
10. Typical front and side elevations and exterior architectural treatment of the proposed units; and
11. The existing and proposed contours at two-foot intervals and that shows existing streams, lakes, marshes, and other natural features.
(Ord. 2024 § 1 (part), 1999; Ord. 2209 § 2 (part), 2008; Ord. 2539 § 25, 2023)