The final subdivision plat requirements of the city provide that water mains, streets, sewer mains and storm drains must be installed at the expense of the subdividers. In connection with the installation of water mains, streets, sewer mains, and storm drains, subdividers are required to extend existing streets and utilities to the property being subdivided. Extensions of water mains, streets, sewer mains, and storm drains may be required to be extended through, or adjacent to, real estate owned by third parties.
(Ord. 1017-A § 2, 2005)