Building permit fees for residential and commercial construction shall be charged in conformance to Section 108 of the 2006 International Building Code, Section R108 of the 2006 International Residential Code, Section 106.5.2 of the 2006 International Mechanical Code and Section 103.4.1 of the 2006 Uniform Plumbing Code. The value to be used in computing the building permit and building plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, profit, fire extinguishing systems, and any other pertinent equipment. Fees shall be calculated from Table 1 from the Building Valuation Data as published by the International Code Council with the regional cost modifier in Table 2 and the valuation as set forth in Table 3, except as follows:
A. Computation of fees for mobile homes located on individual lots shall be the same as for conventional houses.
B. Structures not classed as buildings such as retaining walls, dog kennels, decks, signs, docks and the like shall be charged fees based on the actual cost of labor and materials according to Table 3 of this code.
C. Repair to structures such as re-siding, or painting decks under 30 inches in height, replacing of doors, or any other nonstructural repair shall not require a building permit.
D. The permit fee for the addition to any building shall be computed on the same basis as the building permit.
E. The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under the issued permit.
F. Mechanical Permit Fees. 2006 International Mechanical Code Section 106.5.2 amended. Mechanical fees shall be calculated at 15 percent of the building permit fee.
G. Plumbing Permit Fees. 2006 Uniform Plumbing Code Section 103.4.1 amended. Plumbing fees shall be calculated at 15 percent of the building permit fee.
H. A technology fee of $10.00 shall be applied to each permit issued for permit software upgrades, training and related computer maintenance and replacement.
I. Permits requiring plan review and inspections that are required by the Washington State Energy Code and the Washington State Ventilation and Indoor Air Quality Code shall require a $60.00 plan review and inspection fee.
Tables 1, 2 and 3, attached to the ordinance codified in this section, are incorporated herein by this reference.
(Ord. 2004-07 § 3, 2004; Ord. 2005-06 § 3, 2005; Ord. 2005-18 § 3, 2005; Ord. 2007-25 § 3, 2007)