This chapter shall be known as the environmental health department fee ordinance.
(Ord. 1771 § 2(part), 2018)
2018 | 2019 | 2020 | |||
|---|---|---|---|---|---|
A. | Bed and Breakfast | $174 | $179 | $185 | |
B. | 1. | Restaurant 0–20 Seats | $182 | $196 | $210 |
2. | Restaurant 21–50 Seats | $224 | $242 | $260 | |
3. | Restaurant 51–100 Seats | $277 | $298 | $320 | |
4. | Restaurant 101+ Seats | $381 | $410 | $440 | |
5. | Plus Bar or Catering | $69 | $74 | $80 | |
C. | Bar Only | $145 | $163 | $180 | |
D. | 1. | Temp Food Facility–Annual | $104 | $112 | $120 |
2. | Temp Food Facility–Single Event | $41 | $51 | $60 | |
3. | Event Organizer | $104 | $112 | $120 | |
E. | 1. | Liquor/Convenience Store | $127 | $138 | $150 |
2. | Retail Market <1,000 Sq. Ft. | $173 | $186 | $200 | |
3. | Retail Market 1,000–5,000 Sq. Ft. | $312 | $336 | $360 | |
4. | Retail Market >5,000 Sq. Ft. | $416 | $448 | $480 | |
5. | Each Additional Food Prep | $69 | $74 | $80 | |
F. | 1. | Bakery <1,000 Sq. Ft. | $270 | $300 | $330 |
2. | Bakery 1,000+ Sq. Ft. | $302 | $316 | $330 | |
G. | Catering | $170 | $173 | $175 | |
H. | Produce Stand | $149 | $155 | $160 | |
I. | Mobile or Stationary/Mobile Food Prep Unit | $173 | $186 | $200 | |
J. | Mobile Food Facility–No Prep | $130 | $140 | $150 | |
K. | Commissary | $52 | $56 | $60 | |
L. | Major Plan Review and Preopening Inspection–Deposit | $360 | $360 | $360 | |
M. | 1. | Private School Food Prep Kitchen | $213 | $266 | $320 |
2. | Private School Satellite Kitchen | $144 | $192 | $240 | |
N. | 1. | Public School Food Prep Kitchen | $277 | $298 | $320 |
2. | Public School Satellite Kitchen | $208 | $224 | $240 | |
O. | Vending Machine–Potentially Hazardous Food | $52 | $56 | $60 | |
P. | 1. | Cottage Food Operation–Class A | $57 | $58 | $60 |
2. | Cottage Food Operation–Class B | $147 | $153 | $160 | |
Q. | Farmer's Market | $149 | $155 | $160 | |
R. | CalCode Water System | $104 | $112 | $120 | |
2018 | 2019 | 2020 | ||
|---|---|---|---|---|
A. | Community System–100+ Service Connections | $1,109 | $1,109 | $1,109 |
B. | Community System–25–99 Service Connections | $887 | $887 | $887 |
C. | Community System–15–24 Service Connections | $554 | $554 | $554 |
D. | Nontransient, Noncommunity | $720 | $720 | $720 |
E. | Noncommunity without Additional Permitted Facilities | $355 | $377 | $400 |
F. | Noncommunity with Additional Permitted Facilities | $248 | $274 | $300 |
G. | State Small Water System | $182 | $196 | $210 |
H. | Water System Plan Check–Deposit | $360 | $360 | $360 |
2018 | 2019 | 2020 | ||
|---|---|---|---|---|
A. | Public Pool | $156 | $168 | $180 |
B. | Each Additional Pool or Spa at Same Location | $104 | $112 | $120 |
C. | Public Spa | $139 | $149 | $160 |
D. | Beach/Freshwater Bathing Place | $156 | $168 | $180 |
E. | Private Pool Site Inspection and Clearance | Hourly | Hourly | Hourly |
F. | Public Pool Plan Check and Construction Inspections–Deposit | $360 | $360 | $360 |
2018 | 2019 | 2020 | ||
|---|---|---|---|---|
A. | Detention Facility–Approximately 8 Hours/Year | NC | NC | NC |
B. | Organized Camp (Includes Noncomm. Water System) | $659 | $710 | $760 |
2018 | 2019 | 2020 | ||
|---|---|---|---|---|
A. | Permit Processing Deposit | $1,000 | $1,000 | $1,000 |
B. | Active Landfill Annual Fee | $2,976 | $3,648 | $4,320 |
C. | Closed Landfill Annual Fee (Post-1987) | $1,872 | $2,016 | $2,160 |
D. | Transfer Station Annual Fee | $1,248 | $1,344 | $1,440 |
E. | Truck Inspection–Annual License Fee | $69 | $74 | $80 |
F. | EA Notification Annual Fee | $416 | $448 | $480 |
2018 | 2019 | 2020 | |||
|---|---|---|---|---|---|
A. | Septic Tank Pumper Truck | $195 | $197 | $200 | |
B. | Chemical Toilet Pumper Truck | $120 | $120 | $120 | |
C. | 1. | On-Site Sewage Application and Investigation–New Construction | $260 | $280 | $300 |
2. | On-Site Sewage Application and Investigation–Repair/Expansion | $218 | $229 | $240 | |
3. | Winter Groundwater Monitoring | $208 | $224 | $240 | |
D. | Plan Review Deposit | $312 | $336 | $360 | |
E. | 1. | On-Site Sewage Permit–Conventional | $145 | $163 | $180 |
2. | On-Site Sewage Permit–Nonengineered with Pump Station | $208 | $224 | $240 | |
3. | On-Site Sewage Permit–Engineered Nonalternative | $290 | $325 | $360 | |
4. | On-Site Sewage Permit–Alternative | $624 | $672 | $720 | |
5. | Minor Repair Permit | $124 | $152 | $180 | |
6. | Tank Only Permit | $104 | $112 | $120 | |
F. | 1. | OS Permit Renewal/Reactivation–Nonengineered | $104 | $112 | $120 |
2. | OS Permit Renewal/Reactivation–Engineered | $156 | $168 | $180 | |
G. | County Service Area No. 6 Monitoring | $224 | $237 | $250 | |
H. | Holding Tank Use Permit | $211 | $231 | $250 | |
I. | 1. | Graywater System Application and Site Investigation | $120 | $120 | $120 |
2. | Graywater System Permit | $180 | $180 | $180 | |
J. | Appeal/Variance–Deposit | $360 | $360 | $360 | |
2018 | 2019 | 2020 | |||
|---|---|---|---|---|---|
A. | Water Supply Well Permit | $292 | $296 | $300 | |
B. | Well Deepening Permit | $146 | $148 | $150 | |
C. | 1. | Monitoring Well Permit–Initial | $220 | $220 | $220 |
2. | Monitoring Well Permit–Each Additional | $30 | $30 | $30 | |
D. | 1. | Soil Boring–Initial | $120 | $120 | $120 |
2. | Soil Boring–Each Additional | $30 | $30 | $30 | |
E. | 1. | Ground Source Heat Pump–Initial | $214 | $217 | $220 |
2. | Ground Source Heat Pump–Each Additional | $69 | $74 | $80 | |
F. | Well Destruction Permit | $130 | $140 | $150 | |
G. | Lab Fees | At Cost | |||
2018 | 2019 | 2020 | |||
|---|---|---|---|---|---|
A. | 1. | Parcel Map–Existing PWS | $360 | $360 | $360 |
2. | New OSS–Per Undeveloped Parcel | $271 | $285 | $300 | |
B. | Subdivision–Deposit (Includes Environmental Document) | $1,000 | $1,000 | $1,000 | |
C. | Zone Change | $176 | $208 | $240 | |
D. | Gen Plan Amendment | $176 | $208 | $240 | |
E. | Use Permit | $208 | $224 | $240 | |
F. | 1. | Neg Dec | $144 | $192 | $240 |
2. | EIR–Deposit (Includes Project Processing Fee) | $1,000 | $1,000 | $1,000 | |
G. | BLA–Per Parcel to Be Investigated | $260 | $280 | $300 | |
2018 | 2019 | 2020 | |||
|---|---|---|---|---|---|
A. | 1. | Lg Bus Plan | $497 | $513 | $530 |
2. | Med Bus Plan | $312 | $336 | $360 | |
3. | Sm BP or Fuel Only | $156 | $168 | $180 | |
B. | 1. | CAL-ARP Initial–Deposit | $1,000 | $1,000 | $1,000 |
2. | CAL-ARP Annual | $312 | $336 | $360 | |
C. | 1. | UST PC–Deposit | $1,000 | $1,000 | $1,000 |
2. | Annual Fee–1st Tank | $269 | $315 | $360 | |
3. | Annual Fee–Add'l Tank | $165 | $203 | $240 | |
4. | PC–UST/Piping Alterations–Dep | $360 | $360 | $360 | |
5. | Insp Alterations | Hourly | Hourly | Hourly | |
6. | UST Closure | $373 | $427 | $480 | |
7. | Temp Closure | Same as Annual Fee | |||
D. | 1. | Generator CE | $104 | $112 | $120 |
2. | Small Generator | $208 | $224 | $240 | |
3. | Large Generator | $386 | $388 | $390 | |
E. | 1. | AST Eng SPCC | $347 | $353 | $360 |
2. | AST Self-Cert SPCC | $163 | $202 | $240 | |
F. | State Surcharge Fees | At Cost | |||
2018 | 2019 | 2020 | ||
|---|---|---|---|---|
A. | Facility Annual Permit | $173 | $187 | $200 |
B. | Practitioner Annual Registration | $58 | $62 | $65 |
A. | Vector, Solid Waste, Housing, and Other Nuisance Complaints | ||
1. | Initial Investigation, First Contact, and First Follow-Up Inspection | No charge | |
2. | Additional Follow-Up Visits | $120.00/hour–one-hour minimum–one-half-hour increments | |
A. | 1. | Consultation–Office, >10 Minutes | $120.00/hour–one-half-hour increments | ||
2. | Consultation–Field | $120.00/hour–one-hour minimum–one-half-hour increments | |||
B. | 1. | Copies or Scans–Up to Five, 11" X 17" Max | No charge | ||
2. | Copies or Scans–Six or More | $0.25 per page | |||
C. | Administrative/Appeal Hearing | $240.00 | |||
D. | Late Payment of Annual Fee | 20% of outstanding amount at 90 days, 40% of outstanding amount at 180 days, hearing to review permit suspension or revocation at 270 days | |||
E. | Returned Check Fee | At the rate established by the Amador County treasurer/tax collector | |||
F. | Fee Refund Request Processing Charge | $30.00 | |||
G. | Replacement Permit | $30.00 | |||
H. | Special Inspection or Reinspection | $120.00/hour–one hour minimum–one-half hour increments | |||
I. | Any services not otherwise identified are to be billed at cost for materials and third party services, and $120.00/hour for staff time–one hour minimum–one-half hour increments | ||||