This part contains the basic requirements that apply to the SEPA process. The city of Colville adopts the following sections of Chapter 197-11 WAC by reference:
WAC 197-11-040 | Definitions. |
WAC 197-11-050 | Lead agency. |
WAC 197-11-060 | Content of environmental review. |
WAC 197-11-070 | Limitations on actions during SEPA process. |
WAC 197-11-080 | Incomplete or unavailable information. |
WAC 197-11-090 | Supporting documents. |
WAC 197-11-100 | Information required of applicants. |
WAC 197-11-158 | GMA project review – Reliance on existing plans, laws, and regulations. |
WAC 197-11-210 | SEPA/GMA integration. (WAC 197-11-210 through 197-11-235 optional; does not apply for non-GMA jurisdictions.) |
WAC 197-11-220 | SEPA/GMA definitions. |
WAC 197-11-228 | Overall SEPA/GMA integration procedures. |
WAC 197-11-230 | Timing of an integrated GMA/SEPA process. |
WAC 197-11-232 | SEPA/GMA integration procedures for preliminary planning, environmental analysis, and expanded scoping. |
WAC 197-11-235 | Documents. |
WAC 197-11-238 | Monitoring. (Optional.) |
WAC 197-11-250 | SEPA/Model Toxics Control Act integration. |
WAC 197-11-253 | SEPA lead agency for MTCA actions. |
WAC 197-11-256 | Preliminary evaluation. |
WAC 197-11-259 | Determination of nonsignificance for MTCA remedial actions. |
WAC 197-11-262 | Determination of significance and EIS for MTCA remedial actions. |
WAC 197-11-265 | Early scoping for MTCA remedial actions. |
WAC 197-11-268 | MTCA interim actions. |
(Ord. 1273 NS § 1, 2002)