This chapter governs the installation of power, telecommunications, and cable television facilities. The city of Port Orchard hereby states a long-range goal that all electrical distribution and telecommunications lines shall be underground, with only transformers, switchgear, splice pedestals and similar facilities extending above grade. It is found and determined that the health and safety, particularly of the traveling public, and the general welfare of the residents of the city require that all such existing overhead facilities be relocated underground as soon as practicable in accordance with the requirements specified in this chapter and any applicable rates and tariffs on file with the WUTC.
The city of Port Orchard commits to convert existing overhead power distribution, telecommunications, and cable television facilities to underground as an integral part of construction of any final street improvements. Private developers shall also convert overhead utilities to underground in accordance with this chapter, wherever such development involves the construction of related street improvements. Exceptions and deferral provisions in this chapter are intended to provide for the safe and efficient operation, maintenance, and repair of existing overhead utility systems; for the cost-effective development of small sites; and for the conversion of overhead utilities to underground in an orderly manner.
(Ord. 019-07 § 1; Ord. 030-08 § 2)