[HISTORY: Adopted by the Mayor and Council of the Borough of Red Bank 8-28-2025 by Ord. No. 2025-27. Amendments noted where applicable.]
In addition to other regulations, whether contained in the Borough Code or otherwise, any party undertaking construction activities within the Borough shall adhere to the following guidelines to control dust, trash, and plastic contaminants at their worksites:
A. 
When cutting or drilling AZEK, TREX, any fiberglass, plastic, poly-compound materials, plastics or wood, use a vacuum attachment on all saws when practical to minimize the release of dust and microplastic particles;
B. 
Cut and drill in confined spaces to keep dust levels to a minimum and facilitate ease of cleanup;
C. 
Do not engage in cutting or drilling activities without placing a tarp under power tools to catch debris and contaminants;
D. 
Tarp work areas and clean the area a minimum of once a day to prevent the dispersion of dust and plastic contaminants; and
E. 
Clean up all wood and plastic contaminants before leaving their worksites, ensuring that no waste is left behind nor can be blown into neighboring properties or the street.
A. 
Blowing debris, dust, or plastic contaminants into streets and/or storm drains is strictly prohibited. Waste materials must be disposed of properly in accordance with existing municipal waste disposal regulations.
B. 
Waste and recyclable materials, such as cardboard, must be separated and disposed of in accordance with Borough ordinances.
C. 
Where any site drains to a public stormwater inlet after stormwater leaves the property, prior to cutting, drilling, or engaging in any other activity regulated by this chapter the party shall install a filter at that stormwater inlet made of polypropylene geotextile which conforms to ASTM Test D4491, D4751, and D4355.
A. 
Any person who violates, fails, or refuses to comply with this chapter or any part thereof shall, upon conviction in the Municipal Court, be punished for each offense by a fine not to exceed $1,000. Every such violation or refusal shall be deemed a separate violation, and each day that the same shall continue shall be deemed a separate violation.
B. 
Contractors are responsible for informing their employees and subcontractors of the requirements and obligations set forth in this chapter.