(a) 
It shall be unlawful for any person, firm or corporation to erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy or maintain any building or structure in the town, or cause or permit the same to be done, contrary to or in violation of any of the provisions of this chapter.
(b) 
Any person, firm, or corporation violating any of the provisions of this chapter shall be deemed guilty of a separate offense for each and every day, or portion thereof, during which any violation of any of the provisions of this chapter is committed, continued or permitted, and upon conviction of any such violation such person, firm or corporation shall be punishable by a fine of not more than $2,650. Further, the use of any land, building or structure which is constructed, operated or maintained, contrary to the provisions of this chapter shall be unlawful, and the Town of Mt. Crested Butte, Colorado, may institute injunction, abatement, or other appropriate action to prevent, enjoin, abate or remove such violation.
(Ord. No. 24-6, 9/3/2024)
Parking between the dates of April 16 and November 14 by contractors, subcontractors or any other persons may be allowed on the street within the town's rights-of-way if permission is granted by the building official. This parking shall be on one side only of the street. This on-street parking will be allowed only in the event that parking on the property under construction is not possible, with an explanation submitted to the building official detailing the inability to park on the property. Access through the street must be maintained at all times. Under no circumstances will construction materials or equipment, including tool containers, portable toilets or dumpsters, be allowed within the public right-of-way unless permission is granted by the building official. On-street parking within the town's rights-of-way is prohibited between the dates of November 15 and April 15. Special permission may be granted by the building official for temporary loading and unloading on a case-by-case basis and shall get approval prior to scheduled time.
(Ord. No. 24-6, 9/3/2024)
Contractors, builders and/or building permit holders are required to clean all construction mud, gravel and other debris from all public rights-of-way, that the construction site is responsible for, at least every 48 hours. If the town determines it necessary to do the work on the behalf of the contractor, builder, and/or permit holder the town shall charge the contractor, builder, and/or permit holder the fee for such service as set forth by the town council.
(Ord. No. 24-6, 9/3/2024)
No application under this Chapter may be accepted, processed, or approved if the applicant is delinquent in the payment of any fees, charge, or other amount due the Town, with respect to the property under review or any other property within the Town owned in whole or in part by the same applicant or related entity.