Terms used in this chapter shall have the following meanings:
"Applicant"means a person filing an application for placement or modification of a wireless telecommunications facility in the rights-of-way.
"Application"means a formal request, including all required and requested documentation and information submitted by an applicant to the city, for a wireless placement permit.
Base Station.The term "base station" shall have the same meaning as in 47 C.F.R. Section
1.40001, as may be amended.
"Certificate of completion"means a document that is required from and issued by the city confirming all work described in the application, as approved: (1) was properly permitted, including, without limitation, all required permits for building, electrical work, street or curb cutting, and excavation; (2) was done in compliance with and fulfillment of all conditions of all permits, including all stated deadlines; (3) was fully constructed or placed as approved and permitted; and (4) was finally inspected by the city, and was approved by the city after said final inspection.
"Rights-of-way"means any portion of any road or public way which the city has the responsibility to maintain or manage.
"Tower"means any structure built for the sole or primary purpose of supporting any Federal Communications Commission (FCC) licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the associated site. This definition does not include utility poles.
"Underground areas"means those areas where there are no electrical facilities or facilities of the incumbent local exchange carrier in the right-of-way; or where the wires associated with the same are or are required to be located underground; or where the same are scheduled to be converted from overhead to underground. Electrical facilities are distribution facilities owned by an electric utility and do not include transmission facilities used or intended to be used to transmit electricity at nominal voltages more than 35,000 volts.
"Utility pole"means a structure in the rights-of-way designed to support electric, telephone and similar utility lines. A tower is not a utility pole.
"Wireless infrastructure provider"means a person that owns, controls, operates or manages a wireless telecommunications facility or portion thereof within the right-of-way.
"Wireless permit"means a permit issued pursuant to this chapter and authorizing the placement or modification of a wireless telecommunications facility of a design specified in the permit at a particular location within the rights-of-way; and the modification of any existing support structure to which the wireless telecommunications facility is proposed to be attached.
(Ord. 18-019 § 2, 2018; Ord. 23-004 § 2 (Exh. A), 2023)