A final plat prepared by a registered land surveyor shall be required for all subdivisions. It shall comply in all respects with the requirements of Sections 236.15, 236.16, 236.20 and 236.21 of the Wisconsin Statutes and amendments thereto, this title, and applicable rules of the State Departments of Transportation and Industry, Labor and Human Relations. The final plat shall also include the following:
A.
All lands reserved for future public acquisition or reserved for the common use of property owners within the plat;
B.
Special restrictions as may be required by the Town Board or the county planning and development committee;
C.
Location of the soil absorption field if portions of the proposed lots would be unsuitable for a septic system;
D.
Floodland and shoreland boundaries and the contour line lying a vertical distance of one foot above the elevation of the one hundred (100) year recurrence interval flood or, where such data is not available, a vertical distance of five feet above the elevation of the maximum flood of record;
E.
If the plan includes construction in phases, each phase shall be defined, and estimated start and finish dates shall be noted. Phased construction is permitted, as approved by the Town Board.
F.
Any additional information required by the Town Board.
(7/27/1995; 4/11/2002 (2001 codification))