Installation of fittings within side sewers shall conform to the following spacing, arrangements and size:
All changes in directions shall be made with 1/8 bends (45 degrees), 1/16 bends (22-1-1/2 degrees) or wye branches with the straight-through opening plugged for a cleanout. Not more than two bends shall be installed between cleanouts. Cleanouts, including those for commercial property, shall be installed at locations designated by the City but in no case will the distance between cleanouts exceed 100 feet. Suitable frames and covers of a type designated by the City shall be used for all cleanouts on commercial property and shall be cast concrete block flush with do final paving. Cleanouts which shall extend to within 12 inches of the ground surface shall be plugged to prevent entrance of dirt, toots or ground water.
(Ord. 154 § 7.07, 1974)