All costs and expenses incidental to the installation, connection and maintenance of a side sewer shall be borne by the owner or occupant of the premises served by the side sewer.
(Ord. 154 § 15.01, 1974)
Contracts between property owners and side sewer contractors shall provide that the side sewer contractor will comply with all regulations set forth by the City Council.
(Ord. 154 § 15.02, 1974)
The contractor will furnish the property owner with a release of lien from both labor and material or an affidavit stating same has been paid before payment is accepted for side sewers.
(Ord. 154 § 15.03, 1974)
Any sewer hook-up to new construction not within a development or subdivision shall pay to the City of Everson for the sewer hook-up, the labor, machine, and material to get the side sewer line to the main trunk line.
(Ord. 170 § 1, 1975)
Any sewer line going into a subdivision or development shall be installed by the developer if qualified, or a licensed contractor whose business is installing sewer lines. A developer who requests connecting to the main sewer trunk line of the City's sewer system shall pay for labor, machine and materials to make such a connection.
(Ord. 170 § 2, 1975)
All sewer lines within a subdivision or development shall be in compliance with the standards, rules and regulations as approved or required by the City Engineer and the Public Works Supervisor. All side sewer lines shall be installed according to a design standard approved by the City Engineer and the Public Works Supervisor and signed by an engineer licensed in the State of Washington.
(Ord. 170 § 3, 1975; Ord. 678 § 2, 2008)