A.
A resort complex/commercial resort development shall be allowed as a conditional use in districts as provided in the Table of Use Regulations in Attachment 3.
B.
To be eligible for approval as a new resort complex/commercial resort development, the applicant shall submit a master plan ("Master Plan"), under the conditional use format, as provided for in this chapter. The application shall describe proposed land uses in sufficient detail to document coordinated planning.
C.
Existing resort complex/commercial resort developments.
(1)
Anything to the contrary notwithstanding, the existing resort complex/commercial resort developments, Ski Shawnee Resort Complex, Fernwood Hotel and Resort Complex, and Raj Investments/Pocono Palace Resort Complex, approved under the Middle Smithfield Township Zoning Ordinance of 2004 (see § 025-030 of this chapter) and/or Middle Smithfield Township Zoning Ordinance of 2010-A, shall be deemed to be in conformity with this chapter to the extent that the uses, lots and structures within such resort complex/commercial resort developments as existed at the time of the approval as a resort complex/commercial resort development are within the scope of the Master Plan submitted under the Middle Smithfield Township Zoning Ordinance of 2004, the Middle Smithfield Township Zoning Ordinance of 2010-A, or as otherwise permitted by way of their respective conditional use approval and/or under the provisions of this division for a new resort complex/commercial resort development. No uses, lots or structures which existed at the time of the approval as a resort complex/commercial resort development or are within the scope of the Master Plan submitted under the Middle Smithfield Township Zoning Ordinance of 2004 or are otherwise permitted under the provisions of this division for a new resort complex/commercial resort development shall be deemed nonconforming as a result of that use, lot or structure not meeting the miscellaneous performance standards and regulations or regulations governing specific uses or other dimensional or performance standards or regulations set forth in this chapter.
(2)
An application for approval to revise the approved Master Plan of an existing resort complex/commercial resort development shall be by conditional use and is not required to include fully engineered plans if fully engineered plans will be submitted later as part of a subdivision or land development application, unless otherwise required by the Township Board of Supervisors.
(3)
An existing resort complex/commercial resort development shall, to the maximum extent practicable, coordinate site layout, stormwater management, utilities, trails, parking and traffic access with respect to new development proposed within the resort complex/commercial resort development, provided that redevelopment of existing developed areas shall not be required.
(4)
A revised land development plan shall be required to change or modify uses permitted within the Master Plan or the underlying zoning district, add uses that are either accessory to uses already approved as part of the Master Plan or permitted within the underlying zoning district, make structural alterations to the existing resort complex/commercial resort development, relocate uses, or construct, reconstruct, alter, expand and/or enlarge structures or develop categories of uses provided for under the original Master Plan meeting the standards in the initial approval or which uses are permitted in the underlying zoning district, provided building permits and land development approvals, as may be required, are obtained.
(5)
A new/revised conditional use approval shall not be required to add to, or remove from, a resort complex/commercial resort development (i) less than 10 acres of land in the aggregate over time, or (ii) less than 10% of the total land area, whichever is less, provided that said land is not essential in providing access to or through remaining portions of the resort complex/commercial resort development and is not otherwise essential to meeting minimum development standards.
(6)
A new/revised Master Plan shall be submitted for approval by conditional use for the following:
(a)
Add or remove 10 or more acres of land in the aggregate over time, or 10% or more of the total land area, whichever is less, to or from a resort complex/commercial resort development;
(b)
Add new types of uses not included in the initial conditional use approval and Master Plan and/or which are not permitted in the underlying zoning district;
(c)
Add land to the resort complex/commercial resort development which is not located within a zoning district in which a resort complex/commercial resort development is permitted; or
(d)
Remove and/or add any portion of land from or to the resort complex/commercial resort development which is essential in providing access to or through remaining portions of the resort complex/commercial resort development.