(1) 
This jurisdiction will review all drainage related submittals for general compliance with these criteria. The County's review and approval of storm drainage plan shall not relieve the Applicant, Owner, or Project Engineer from responsibility for ensuring that all facilities are safe, that other property owners are not adversely affected, and that calculations, plans, specifications, construction, and as-built drawings comply with normal engineering standards, this Chapter, and all applicable federal, state, and local laws and codes.
(2) 
Any property owner prior to submitting any permit application that may require a storm drainage plan may request a preliminary review of the proposal by the Administrator. Such preliminary review shall not be binding upon either party.
(Ord. 1161 § 8, 1998)
(1) 
The jurisdiction will not approve plats, grant certificates of occupancy, release financial securities related to drainage and erosion control, or accept final construction until the following have been completed:
(a) 
Letter of Certification.
(b) 
Filing of covenants on lots, property owners association articles, maintenance agreements, and agreements with adjacent property owners.
(c) 
Conditions of approval fulfilled.
(d) 
Special requirements on the cover sheet of plat, such as drywell or surface retention pond sizes, and an easement for protection and maintenance.
(2) 
A letter of certification shall be submitted to Lewis County Public Works stating that the constructed drainage facilities conform to the approved plans and specifications. The Letter of Certification shall bear the seal and signature of a licensed Civil Engineer, or the notarized signature of the Owner (where an engineered design was not required) swearing to such conformance.
(Ord. 1161 § 8, 1998)