At any time within the time period established in LCC § 17.05.140, the subdivider may cause the subdivision to be surveyed and a final plat to be prepared. The original copy shall be filed with the administrator. Any failure to record a final plat within time limits specified in LCC § 17.05.140 shall terminate all proceedings.
(Ord. 1169 § 1, III, R, 2000; Ord. 1269 § 3, 2016; Ord. 1325 § 1 (Att. B), 2021)