This section contains the rules for preparing environmental impact statements. The county adopts the following sections as now or hereafter amended by reference, as supplemented or modified by this section:
WAC 197-11-400 | Purpose of EIS. |
WAC 197-11-402 | General requirements. |
WAC 197-11-405 | EIS types. |
WAC 197-11-406 | EIS timing. |
WAC 197-11-408 | Scoping. |
WAC 197-11-410 | Expanded scoping. |
WAC 197-11-420 | EIS preparation. |
WAC 197-11-425 | Style and size. |
WAC 197-11-430 | Format. |
WAC 197-11-435 | Cover letter or memo. |
WAC 197-11-440 | EIS contents. |
WAC 197-11-442 | Contents of EIS on nonproject proposals. |
WAC 197-11-443 | EIS contents when prior nonproject EIS. |
WAC 197-11-444 | Elements of the environment. |
WAC 197-11-448 | Relationship of EIS to other considerations. |
WAC 197-11-450 | Cost-benefit analysis. |
WAC 197-11-455 | Issuance of DEIS. |
WAC 197-11-460 | Issuance of FEIS. |
(Ord. 1080 § 5 Preamble, 1984; Ord. 1157, 1998; Ord. 1170B, 2000)