The permit fee for each property owner seeking to connect to the town system of sewers shall be an amount equal to the actual cost to the town of the labor and materials required to install and make said connection, plus a sum equal the thirty-three and one-third percent of such actual cost of labor and materials. At the time when application for a side sewer permit for connection to the town system of sewers is made, the applicant shall pay to the town a deposit upon the estimated actual cost, the amount of which deposit shall be determined by the town superintendent, but in no event less than $100.00. Upon completion of the installation of the connection, the town shall render a statement for the full charge for such installation, which shall be paid by the applicant to the town within 10 days from the date of such statement, less the amount of the deposit paid with the application. Any such charge not so paid within 10 days of the date of the statement of charges shall bear interest at the rate of 12 percent per annum from date of the statement.
(Ord. 198 § 4.02, 1975; Ord. 255 § 2, 1980)