Prior to the issuance of a site development activity permit and prior to beginning any construction activity on a project site, the owner of the project will be required to record a performance covenant or post a performance surety, in the form of a bond as defined in Section 12.12.020, for site stabilization and erosion and sedimentation control.
This performance requirement for stabilization and erosion control should not be confused with the performance bond accepted at the time of final plat recording as a surety for construction items not yet completed. When a performance bond is accepted for a final plat in lieu of construction completion, the surety or covenant for stabilization and erosion control will be released, and the new performance bond shall cover site stabilization and erosion control along with the other incomplete construction items.
Bonding or covenants for site stabilization are not required for projects constructed or owned by Kitsap County.
(Ord. 540 (2016) § 4 (Att. 1) (part), 2016)