“Start of construction”means the date that the first placement of permanent construction, reconstruction or repair occurs, provided the actual start of construction, repair, reconstruction, placement or other improvement was within 180 days of the permit date. Permanent construction is work such as the pouring of a slab or footings, the installation of piles, the construction of columns, the placement of a manufactured home, or any work beyond the stage of excavation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets, driveways, or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not part of the main structure. For substantial improvement, the start of construction shall be the first alteration of any wall, floor, ceiling, or other structural part of a building, whether or not the alteration affects the external dimensions of the building.
(Ord. 80 (1980) § 2 (part), 1980; Ord. 310 (2003) § 18, 2003)