All public streets and alleys hereafter constructed in the city of Clarkston shall be constructed in accordance with Division II of the Standard Specifications and with a base and type of surfacing approved by the DPW. The types of surfacing are:
(1)
Permanent streets. Cement concrete pavement as specified in Section 39 or asphaltic concrete pavement, Class B, as specified in Section 34 of the Standard Specifications, together with cement concrete curbs and gutters. The city will normally expect to maintain such pavements for an indefinite period of time.
(2)
Alleys. Bituminous surface treatment, as specified in Section 32 of the Standard Specifications; provided, if asphaltic concrete pavement is requested by LID project, construction would be in conformity with subsection (1) of this section.
(3)
Crushed rock surfacing type. Ballast and crushed surfacing as specified in Section 23 of the Standard Specifications and constructed to at least meet the requirements of a base for a permanent type pavement.
(Ord. 649 Ch. VII § 1, 1967)