An industrial user shall provide wastewater treatment. Such treatment shall comply with this chapter and shall also achieve compliance with all applicable federal, state, and local pretreatment standards and requirements, within the time limitations specified by the EPA, the Washington State Department of Ecology, or the control authority, whichever is more stringent. The wastewater treatment can be obtained by physical process, biological process, or by other process or means, except as prohibited by 40 CFR Section 403.6(d). Appropriate pretreatment technology includes control equipment, such as equalization tanks or facilities, for protection against surges or slug discharges that might interfere with or otherwise be incompatible with the POTW. Where wastewater from a regulated process is mixed in an equalization facility with unregulated wastewater or with wastewater from another regulated process, the effluent from the equalization facility must meet an adjusted pretreatment limit calculated in accordance with 40 CFR Section 403.6(e). Any pretreatment facilities necessary for compliance with this chapter shall be provided, operated and maintained at the industrial user's expense and satisfy applicable requirements for content, review and acceptance of engineering reports, plans and specifications for construction and modification of pretreatment facilities, including an operation and maintenance manual as set forth in Chapter 173-240 WAC.
The control authority may, in its sole discretion, waive the requirement for a three-step submission of documents and require instead conceptual plans with such information from the engineering report and operation manual that the control authority determines will demonstrate compliance with this chapter. Construction or modification of a pretreatment facility shall not commence until engineering reports, plans and specifications for the project have been submitted to and approved by the control authority. Unless waived by the control authority, such reports shall be prepared under the supervision of, and bear the seal of, a professional engineer licensed in accordance with Chapter 18.43 RCW. The review and acceptance of the engineering reports, plans and specifications, and operation and maintenance manual, shall in no way relieve the industrial user from its obligation to comply with the provisions of this chapter, including modification of its pretreatment facility as necessary to produce a discharge acceptable to the control authority under the provisions of this chapter.
(Ord. 1685 § 3 (Exh. A), 2022)