A.
A final map or a parcel map, prepared by or under the direction of a licensed land surveyor (land surveyor) or a civil engineer licensed prior to 1982 (civil engineer), based upon a field survey shall be made in conformity with the Professional Land Surveyor’s Act. (Business and Professions Code Sections 8700 through 8805) and the Subdivision Map Act.
B.
An accurate and complete boundary shall be made of the land to be included on the final map or parcel map. The map shall show the location of each parcel and its relationship to any and all surveys prepared in the area.
(Ord. 1-91 § 1 (8-5.0); Ord. 4-16 § 1 (Exh. A) (part))