The purpose of this subchapter is to:
A. 
Ensure that the adequate provision of public facilities and services is maintained as new development occurs; and to
B. 
Fairly allocate the cost of those facilities and services.
(Ord. 238 Ch. VI § 1(A), 2000)
A. 
All development proposals that require City approval shall be adequately served by the following facilities and services prior to the time of occupancy, plat recording, or other land use approval, as further specified in this chapter:
1. 
Sewer and/or wastewater disposal;
2. 
Water supply;
3. 
Fire protection service;
4. 
Surface water and stormwater management; and
5. 
Streets and access.
B. 
Regardless of the number of related permits required for a single development proposal, the provisions of this chapter shall be applied only once to any single development proposal. If changes and modifications result in impacts not considered when the proposal was first approved, the City shall consider the revised proposal as a new development proposal.
C. 
All sewer and water connections within the City right-of-way shall be made in accordance with the applicable engineering standards specified in Chapter 20.70 SMC.
(Ord. 238 Ch. VI § 1(B), 2000)