The applicant shall leave the street or alley over, along or across which any building or structure shall be moved in as good condition as the same was before such moving. If it is necessary to take out temporarily and then reset poles and wires owned by the city, and the city engineer approves, the work of taking out and resetting such poles and lines shall be done by the city at the expense of the applicant, who shall promptly pay to the city the amount of such expense. The applicant shall proceed with the moving continuously from day to day until completed, Sundays and holidays excepted, with the least possible obstruction to streets or alleys. He shall keep a watchman at the building while on any street or alley from sundown to sunrise, during each night the same shall remain thereon and, during such time, shall keep signal lights displayed on all sides of such building or structure and give anyone going upon such street or alley such warning as will be necessary to prevent injury to persons and property.
The applicant shall comply with such additional provisions and conditions as may be prescribed by the city engineer in the permit.
The permit shall prescribe the mode of moving such building or structure and the street or alley over which such moving may be made, and such moving shall at all times be subject to the control or direction of the city engineer.
(Ord. 37 § 1.02)