Water transmission, storage, source of supply and frontage facilities charges shall be assessed and collected as a condition precedent to providing water service connection by the city of Richland according to the following table:
Size of Water Meter | Facilities Assessment for Indoor and Nonirrigation Uses Only1 | Facilities Assessment for Uses That Include Outdoor Landscape Irrigation and Car Washes2 | Facilities Assessment for Badger South3,4 | Frontage Charge5 |
|---|
3/4" | $2,100.00 | $2,990.00 | $2,235.00 | $15/ft. |
1" | 2,100.00 | 2,990.00 | 2,235.00 | 15/ft. |
1 1/2" | 6,993.00 | 9,957.00 | 7,443.00 | 15/ft. |
2" | 11,193.00 | 15,937.00 | 11,913.00 | 15/ft. |
3" | 21,000.00 | 29,900.00 | 22,350.00 | 15/ft. |
4" | By Contract | By Contract | By Contract | 15/ft. |
6" | By Contract | By Contract | By Contract | By Contract |
Notes: |
|---|
1 This charge is for residential and commercial lots which have a separate irrigation source and typically do not have a high demand water usage season. |
2 This charge is for residential and commercial lots which do not have a separate irrigation source or do have a high demand water usage season (i.e., a car wash). |
3 The Badger South facilities assessments will be collected by the city as part of the building permit approval process. The city will reimburse the Badger Mountain Irrigation District $300.00 per ERU (ERU is an equivalent residential unit or a service provided by up to one-inch meter size) on the first 350 ERUs collected and reimburse $192.00 per ERU thereafter. |
4 The Badger South area is defined as shown in Exhibit A attached to the ordinance codified in this section. |
5 The frontage fee shall apply to all connections to the public water system except: |
A. When the existing main crosses the entire property frontage and was installed by the property owner or developer of the property; or |
B. When the existing main crosses the entire property frontage and was included in an approved latecomer agreement. |
For a corner lot, the frontage fee shall be calculated on the longest side of the lot. |
The city, as part of the Tri-Cities Estates Local Improvement District (LID) No. 190, constructed water main lines in Oxford Avenue and Oregon Street. Three residences did not participate in the water portion of the LID. The following three properties are required to pay a lump sum frontage charge of $3,166.45, in addition to the applicable meter charge and facility assessment, at the time of connection to the city water system. These three properties are: 1366 Baywood, 1381 Baywood, and 1391 Baywood. On January 1st of each year, beginning in 2009, the lump sum amount shall be adjusted to compensate for inflation as documented in the Consumer Price Index – Urban (CPI-U) using the Pacific Cities, West – B/C data for July of the previous year. As of January 1, 2022, the rate has been updated to $4,150.09.
* Editor's note: The Tri-Cities Estates water latecomer rates in RMC §
18.24.050 were updated on January 1, 2022.
The water facilities assessment may be waived by the Richland city council when providing a water service connection, or connections, to any municipally owned public park, where the cost of constructing such municipally owned public park, or a portion of such cost, has been borne by the property owners specially benefitted thereby and may likewise be waived by the Richland city council when providing water service connection, or connections, to previously existing residences where the cost of providing a water service connection, or connections, is paid in whole or in part by a state or federal grant-in-aid community rehabilitation, or to newly constructed residences where the cost of providing a water service connection, or connections, is paid in whole or in part by a state or federal grant to provide housing for low income families or handicapped persons and may likewise be waived by Richland city council when providing a water service connection or connections for new publicly funded facilities built for public use.
(Ord. 11-76; Ord. 21-77; Ord. 66-77; Ord. 14-85; Ord. 10-91; Ord. 12-94; Ord. 06-04; Ord. 38-07; Ord. 29-08; Ord. 22-10 § 1.01; Ord. 11-12 § 1; Ord. 57-15 § 1; Ord. 2022-11 § 2; Ord. 2023-28 § 7)