There is required, upon the demolition or removal of any building or other structure within the city limits, of the owner, contractor, builder or any other individual charged with said demolition or removal, the following:
A.
All visible remnants of the building razing or removal shall be removed from the lot, site or parcels.
B.
Footings, foundations and foundation walls shall be removed.
C.
Basement excavations shall be filled and compacted to prevent future soil settlement per the requirements of the city.
D.
Driveways and parking lot surfacing shall be removed. All on-site parking lot bullrails, traffic channeling devices and sidewalks shall be removed.
E.
The grade of the former building site, including driveways and parking lots, shall be restored to natural grade or as determined by the city.
F.
Perimeter sidewalks, curbs and curb-cuts in city rights-of-way shall be left undisturbed or replaced after demolition in accordance with Chapter 13.04 PMC.
G.
Earth retaining walls, formerly used to establish grade for the building site or provided protection of adjoining property, shall not be removed.
(Ord. 673 § 1, 1977; Ord. 1505 § 6, 2001)