Final street, private lane, storm sewer, water and underground services plans must be submitted to the town staff for approval prior to actual construction. If any changes are made during the installation, revised drawings showing the exact location of same must be provided to the town staff. All utilities or storm drains installed in the streets shall be constructed prior to the surfacing of such streets. Service connections for all utilities shall be laid to such lengths as will obviate the necessity for disturbing the street improvements when service connections are made.
(Ord. 497 § 1, 2000; Ord. 603 § 1, 2009)