[Ord. No. 686-2026, 1-20-2026]
A.
Permit Requirement. Any person seeking to perform work within the public right-of-way (ROW) must first apply for and obtain a ROW permit, in addition to any building permit, license, easement, franchise, or other authorization required by law.
1.
Emergency ROW work may begin immediately; however, the Street Superintendent must be notified as soon as practicable and a permit application submitted no later than the third business day after work commences.
2.
The Street Superintendent may issue general permits covering emergency ROW work for multiple sites or Citywide needs.
B.
The Street Superintendent may issue general permits covering emergency ROW work for multiple sites or Citywide needs.
1.
The name, address, and 24/7 contact information of a responsible representative or if different from the applicant, the name, address, and contact information of the facility owner/operator.
2.
A description of the proposed work, including conceptual and engineering site plans showing dimensions, location, number of street crossings, and proximity to existing facilities.
3.
For areas with landscaping, irrigation, lighting, or other special features, photos and owner approvals are required if an alteration is proposed.
4.
Projected start and end dates, or a statement that notice will be provided when dates are determined.
5.
All certificates of insurance and performance/maintenance bonds.
C.
Form Of Submission. Applicants may submit information in their existing format if it addresses the application requirements. The Street Superintendent may grant a reasonable amount of time to complete the applications.
D.
Fees And Deposits. Each application must include:
1.
A City-approved application fee.
2.
A refundable pre-construction meeting deposit (returned upon verified attendance).
3.
An escrow or bond for restoration purposes.
4.
Any amounts owed to the City for past fees, damages, or emergency actions (subject to good-faith dispute review by the Street Superintendent).
5.
Failure to apply for a permit may result in triple permit fees, except for emergency ROW work.
E.
Coordination Of Work. Applicants must participate in coordinated planning, joint construction, and advance notification efforts as directed by the Street Superintendent. The City may require facility sharing when reasonable and legally permitted to minimize disruption and preserve aesthetics.
F.
Capacity And Records. The Street Superintendent shall maintain indexes of ROW permits and may establish procedures for determining available capacity in existing facilities.