All electrical construction and installation, all electrical material and appliances, and all arrangement of electrical apparatus on the load side of the service shall be in conformity with the specifications, rules and regulations of the National Electrical Code, current edition, Batterymarch Park, Quincy, MA, and that said code is hereby adopted by reference as if set forth fully herein.
(Ord. 714 § 1, 2006)