The erection, construction, reconstruction, alteration, moving or change of use of any building or structure shall not be commenced without obtaining a building permit from the building inspector. No permit shall be issued by the building inspector unless satisfied that the building or use contemplated complies with all the provisions of this chapter. Building permit fees are levied by the building inspector as set forth in the Wheatland building permit fee schedule.
(Formerly 18.95.010; 1996 Code § 7-80; Ord. 827, 2020; Ord. 834, 2022)