Before any person, firm or corporation shall have the right to construct any underground facility in the streets or the highways within the city of Omak or in any way open the surface of any street or highway within the city of Omak, including the curb and sidewalk adjacent thereto, such party shall obtain permission from the public works director for the city of Omak and shall obtain and deliver to the city of Omak a performance bond running to the city with sureties acceptable to the city in the amount of five thousand dollars per contractor, a fifteen-thousand dollar bond or other satisfactory financial security acceptable to the city posted by a utility company on behalf of its various subcontractors, conditioned that the party shall make all necessary and reasonable repairs to return the street, highway, curbs, sidewalks and/or underground facilities to as good or better condition as before the commencement of any such project. This requirement shall not be in addition to the requirements of Section 9.08.160 of this code, but shall have application only in those instances not covered by the provisions of Section 9.08.160 of this code.
(Ord. 775 § 1, 1978; Ord. 810 § 1, 1979; Ord. 1106 § 1, 1989)