Public improvements for which the subdivider has been bonded shall be constructed in accordance with Article
X, Design Standards, with the construction specifications for subdivisions as adopted by the Village Board. Said specifications shall be drawn up by the Village Engineer, and the Village Engineer shall be the enforcement officer thereof.
Fire wells shall be installed according to the specifications
of the Fire Department, such specifications to be on file at the office
of the Planning Board. Upon completion of the installations, the subdivider
shall contact the Fire Department so that a representative of the
Department may arrange any appropriate tests of the well before acceptance.
[Added 3-12-1983]
No building permit shall be issued with respect to any lot in
any subdivision until all water mains and fire hydrants or fire wells,
as required by the Planning Board for such subdivision, shall have
been installed and placed in operation.
[Amended 6-4-1997 by L.L. No. 1-1997]
A. A review fee shall be required for review of proposed subdivisions. The amount of such fee shall be as specified in §
162-61.
[Amended 7-18-2003]
B. An inspection fee shall be required for field inspections of improvements in accordance with §
162-43. The amount of such fee shall be as specified in §
162-61.
C. If a subdivision is abandoned, no part of the inspection or review
fees already paid to the Village will be returned to the subdivider.