[Adopted 4-29-1981 by L.L. No. 3-1981 as Ch. 98, Art. II, of the 1975 Code]
A. 
Unless the contents specifically indicate otherwise, the meaning of the terms used herein shall be as follows:
APPLICANT
Any person, partnership, corporation, company or other party which proposes to design and construct a central water system under these rules and regulations and the local law. It shall also mean to include the "applicant's" engineer, contractor, agent or representative.
APPROVED PLANS
Those drawings and specifications detailing the construction of the central water system as approved by the Town of LaGrange, the New York State Department of Environmental Conservation, the New York State Department of Health, the Dutchess County Department of Health and any other agency, board or related governmental units.
CENTRAL WATER SYSTEM
A water supply and distribution system serving two or more users.
LOCAL LAW
Local Law No. 5 of the year 1978 of the Town of LaGrange, "A Local Law Establishing Rules and Regulations for the Installation of Water Supply and Distribution Systems in the Town of LaGrange."
[1]
USER
Any residential or nonresidential individual, firm, company, association, society, corporation or group using the central water system.
[1]
Editor's Note: Refers to the local law which originally enacted this article, prior to adoption via the 1981 Code Adoption Local Law.
B. 
All other definitions shall be as stated in this article.
A. 
It is the purpose of these rules and regulations to establish minimum and acceptable standards and specifications for the installation of water supply and distribution systems within the Town of LaGrange.
B. 
No building permits will be issued for any user supplied by a central water system until such time as the Town has determined that the central water system contains sufficient capacity to adequately supply water to said user and that the construction of the central water system serving said user is in conformance with the approved plans and these rules and regulations.
A. 
Throughout these rules and regulations, certain documents shall be referred to. These documents shall be made a part of these rules and regulations as though they were printed in full herein.
B. 
Unless noted otherwise, the latest edition, together with all changes and amendments, of the referenced documents shall apply.
C. 
Local Law No. 3 of the year 1978 of the Town of LaGrange, "A Local Law Regulating the Establishment, Construction, Installation, Extension, Enlargement, Acquisition, Operation and Use of Water Supply and Distribution Systems in the Town of LaGrange," shall be made a part of these rules and regulations.[1] Wherever there is a conflict between the local law and these rules and regulations, the local law shall govern.
[1]
Editor's Note: See Art. I, Nonpublic Water Supply and Distribution Facilities, of this chapter, which was originally enacted by L.L. No. 3-1978, prior to adoption via the 1981 Code Adoption Local Law.
A. 
Times of inspection.
(1) 
Inspections will be made on weekdays (no holidays) between the hours of 8:00 a.m. and 4:00 p.m.
(2) 
No work will be started until a permit has been obtained from the Town as required by local law.
(3) 
The form of the permit shall be in the form of Attachment A[1] herein. The fee for the permit is provided for in § 233-4 of this chapter.
[Amended 7-22-2009 by L.L. No. 2-2009]
[1]
Editor's Note: A copy of the water permit form, referred to herein as "Attachment A," is on file in the office of the Town Clerk.
(4) 
Prior to construction, the applicant shall submit to the Town a construction schedule detailing when the various items of work will be performed.
B. 
Securities required. Prior to any construction, the applicant shall post the following securities with the Town Clerk:
(1) 
A certificate of insurance naming the Town and its agents and representatives as the insured, in the amounts and form designated by the Town.
(2) 
Performance bonds as required by the local law.
(3) 
Operation and maintenance bond and guaranty as required by the local law.
(4) 
Written agreements as required by the local law.
C. 
Prework conference. Prior to the commencement of any work, there shall be a prework conference between the Town, the Engineer, the applicant and his contractor to go over these rules and regulations and any other requirements established by the Town. It is the intent of the prework conference to make all parties aware of the requirements governing the proposed work.
A. 
The minimum size of all water distribution lines shall be eight inches in diameter, unless otherwise approved by the Town.
B. 
Only new material shall be used throughout the work. Workmanship shall be first-class.
A. 
The type, size and class of materials required for construction of the work specified herein shall be as called for herein or on the approved plans. All materials shall be tested at the place of manufacture as required by the standard specifications to which the material is manufactured or as required herein. The applicant shall, at his own expense, furnish, in duplicate, to the Engineer, sworn certificates of such tests. In addition, the Town reserves the right to have any or all materials inspected or tested, or both, by an independent inspection service at either the manufacturer's plant or elsewhere.
B. 
All materials shall be subject to a careful inspection in the presence of the Engineer or his authorized inspector just before being laid or installed and shall be subject to his approval before acceptance. All material found, during the progress of the work, to have cracks, flaws or other defects shall be rejected by the Engineer or his authorized inspector, and the applicant shall promptly remove such defective material from the site of the work.
C. 
All materials shall conform to the following requirements:
(1) 
Selected material for trench bottom. Selected material for trench bottom shall consist of sand, or sand and gravel, well graded from coarse to fine, not lumpy or frozen, and free from slag, cinders, ashes, rubbish or other material which, in the opinion of the Engineer, is objectionable or deleterious. The graduation of the material shall be as follows:
Square Mesh Sieves
Percent Passing by Weight
3/4 inch
100%
1/4 inch
30% to 65%
No. 40
5% to 30%
No. 100
0% to 10%
(2) 
Gravel fill. Gravel fill shall consist of sound, tough and durable particles of crushed or uncrushed gravel, free from soft, thin, elongated or laminated pieces and organic or other deleterious substances. It shall conform to the following graduations:
Square Mesh Sieves
Percent Passing by Weight
3 1/2 inch
100
1/4 inch
30% to 65%
No. 40
5% to 30%
No. 100
0% to 10%
(3) 
Sheeting, shoring and bracing.
(a) 
Lumber used for sheeting, shoring and bracing shall be sound, straight-grained and free from shakes, loose knots and other defects liable to impair its strength or durability. Lumber and sheeting may be reused if not ordered left in place and if in good condition. Lumber shall be spruce, fir or a reasonable equal thereto.
(b) 
Steel used for sheeting, shoring and bracing shall conform to the following requirements:
[1] 
The steel shall be made by the open hearth process and shall conform to the following requirements as to chemical composition:
[a] 
Phosphorus not over 0.06%.
[b] 
Sulfur not over 0.06%.
[2] 
The steel shall conform to the following requirements as to physical properties:
[a] 
Minimum tensile strength shall be 70,000 pounds per square inch.
[b] 
A minimum tensile strength of 60,000 pounds per square inch shall be permitted for piling used in the fabrication of corners, tees, etc.
[c] 
Bent test specimens shall stand being bent cold through 180º around a pin, the diameter of which is equal to twice the thickness of the specimen, without cracking on the outside of the bent portion.
[d] 
All steel-rolled beams and shapes shall conform to the requirements of ASTM A36.
(4) 
Concrete. Concrete for cradles, pipe encasement, cast-in-place manholes, bases and special structures shall conform to ACI-318, three-thousand-pound-per-square-inch stone concrete at 28 days, 5% to 7% entrained air, four-inch maximum slump, unless otherwise noted.
(5) 
Steel reinforcement. Steel reinforcement embedded in concrete shall conform to ASTM A615, Grade 40 or 60, deformed bars, unless otherwise noted.
(6) 
Cement mortar.
(a) 
Cement mortar shall be composed of portland cement mixed in the proportion of one part by measure of cement to two parts by measure of clean, sharp sand, free from all foreign materials and organic matter. The cement and sand shall be carefully mixed dry, the water afterwards added and the mortar made fresh for the work at hand. No mortar shall be used which is found to be weak or imperfect, either from standing too long after being mixed or from any other cause.
(b) 
The cement to be used shall be of the best American portland, or a brand approved by the Engineer, and shall meet all the requirements and tests of the ASTM Specification Designation C-150, Type II. Where required, the mortar shall be of a nonshrink type containing Embeco or an approved equal and shall be mixed in accordance with the manufacturer's instructions. Sand shall conform to the requirements of ASTM Specification Designation C-144.
(7) 
Brick.
(a) 
Brick must be of the best quality, whole, sound, hard-burned, of perfect shape, presenting a regular, smooth surface and shall have a crushing strength of at least 5,000 pounds per square inch, and after being thoroughly dried and then immersed in water for 24 hours, it shall not absorb more than 16% in weight of water.
(b) 
The brick shall be culled when delivered on the job, and all imperfect bricks shall be immediately removed from the job.
(8) 
Ductile iron pipe and cast-iron fittings.
(a) 
Ductile iron pipe and cast-iron fittings shall be cement-lined, rubber-gasket, push-on, mechanical- or restrained-joint type conforming to the following specifications:
[1] 
Rubber gasket joints: AWWA C 111/ASA A 21.11.
[2] 
Cement lining: AWWA C 104/ASA A 21.4; minimum thickness through 12 inches: 1/8 inch.
[3] 
Fittings: AWWA C 110/ASA A 21.10.
[4] 
Pipe: AWWA C 151/ASA A 21.51.
(b) 
Pipe thickness class shall be in accordance with ASA A21.50, Table 4, for Type B laying condition and three-hundred-pound-per-square-inch working pressure at the various depths.
(9) 
Copper tubing. Copper tubing shall be Type K soft annealed copper water tube conforming to AWWA Specification 7S-CR and shall be 3/4 inch for a single-family residence. Larger sizes may be required for other uses.
(10) 
Valves.
(a) 
Gate valves.
[1] 
Valves shall be iron-bodied, bronze-mounted, one-hundred-fifty-pound-per-square-inch service, nonrising stem, double disc, parallel seat valves with O-ring seals and mechanical joints and shall conform to AWWA Specification C-500 gate valves for buried service.
[2] 
All valves shall open counterclockwise and shall be provided with the standard two-inch-square wrench nut operator.
[3] 
Each valve shall be provided with a two-piece slide-type valve box with cover labeled "water." Curb boxes shall be cast iron, painted with a tar base enamel.
(b) 
Check valves. Check valves shall be line size, mechanical-joint, iron-bodied, bronze-mounted, horizontal-swing type, rated at 175 pounds per square inch. Check valves shall have regrind-renew bronze seat and disc, which may be repaired without removing valve body from the line, and bolted cover. Valves shall be Underwriters' approved.
(c) 
Tapping saddles and valves for wet taps.
[1] 
Tapping saddles shall be of ductile iron with an O-ring-type sealing gasket. The tapping saddles shall be clamped to the pipe with straps 1/4 inch by 1 1/2 inches. Clamping straps, bolts and nuts shall be of high-strength, corrosion-resistant alloy steel. Tapping saddles shall have flanged ends suitable for the tapping machine and valve and shall be ASA Class 125.
[2] 
Tapping valves shall be as specified in the following subsection.
(d) 
Tapping sleeves and valves for wet taps.
[1] 
Tapping sleeves shall be designed to strengthen the pipe where it is attached so that, when the pipe section is removed, the pipe shall not be weakened. Tapping sleeves shall be of the mechanical-joint type with gaskets to suit the service with a flange connection to the tapping valve.
[2] 
Tapping valves shall be of the same construction as gate valves hereinbefore specified. The inlet flange shall be machined to mate with the tapping sleeve flange. Valve seat shall be large enough to allow a full diameter cut to be made. Valve stem shall have O-ring seals and a two-inch-square nut operator. Valve shall open counterclockwise. Valve box shall be provided as hereinbefore specified.
[3] 
Tapping sleeves and valves where and of the sizes shown and specified herein shall be provided while the line is in service and without loss of water. Rated working pressure shall be two hundred pounds per square inch.
[4] 
Tapping sleeve, valve, drilling equipment and accessories shall be the product of one manufacturer. All required labor and equipment to install the wet taps shall be provided by the applicant.
(e) 
Curb stops.
[1] 
Curb stops shall be of the size(s) shown herein and on the approved plan, full round way opening, teflon-coated plug, O-ring sealed, of brass construction, solid tee head, one-hundred-seventy-five-pound-per-square-inch service and conforming to AWWA Specification C 800.
[2] 
Curb stops shall be provided with a two-piece slide-type base curb box. The lid and pentagon plug shall be fastened with iron to bronze thread. Stationary rods shall be provided. Dirt cap for outlet side of stop and foot piece for curb boxes shall be provided.
(f) 
Corporation stops and goosenecks.
[1] 
Corporation stops shall be all-bronze construction, ground key stop, solid tee head, one-hundred-seventy-five-pound-per-square-inch working pressure rating, and shall have threads conforming to AWWA Specification C 800. Each corporation stop shall be provided with a gasket and one-fourth-bend coupling suitable to connect flared copper tubing.
[2] 
Goosenecks shall be field fabricated of copper tubing as shown on the plans.
[3] 
Corporation stops shall be 3/4 inch for single-family residences. Other services shall be as shown on the approved plans. Where corporation stops larger than one inch are to be installed on pipelines smaller than 14 inches in diameter, double-clamped tapped service saddles of ductile iron with molded rubber gaskets shall be provided.
(11) 
Hydrants.
(a) 
Fire hydrants shall be five-and-one-fourth-inch compression type, and shall conform to AWWA Specification C-502.
(b) 
Hydrants shall be traffic type with breakable couplings and/or bolts at the ground line and shall open counterclockwise.
(c) 
Hydrants shall have a six-inch mechanical-joint side inlet foot piece, two two-and-one-half-inch hose nozzles and one four-and-one-half-inch pumper nozzle. Nozzles shall all be national standard hose threads.
(d) 
Packing shall be O-ring type.
(e) 
Hydrants shall be Mueller, five-and-one-fourth-inch valve opening, Catalog No. A-24015.
(f) 
Hydrants shall be painted solid red. Installed hydrants shall be touched up to remove any marks or scraped paint caused by installation or transit.
A. 
Handling of material. All materials furnished shall be delivered and distributed at the site by the applicant and shall be properly protected from the weather and, where required, stored under cover. Pipe and other materials shall be loaded and unloaded by lifting with hoists or skidding so as to avoid shock or damage. Under no circumstances shall such materials be dropped. Pipe handled on skidways shall not be skidded or rolled against pipe already on the ground.
B. 
Sewage, surface and flood flows. The applicant shall furnish all the necessary equipment, shall take all necessary precautions and shall assume the entire cost of handling any water from leakage or breaks of existing mains, sewage, seepage, storm, surface and flood flows which may be encountered at any time during the construction of the work. The manner of providing for these flows shall meet with the approval of the Engineer.
C. 
Provision for public safety.
(1) 
To protect persons from injury and to avoid property damage, adequate barricades, construction signs, torches, warning lights and guards as required shall be placed and maintained during the progress of the construction work until the site is safe for public use. Whenever necessary, watchmen shall be provided to prevent accidents. Rules and regulations of the local authorities regarding safety provisions shall be observed.
(2) 
Excavations shall be conducted to cause the least interruption to traffic. If so directed by the Engineer, the applicant shall provide suitable bridges at street and driveway crossings where traffic must cross open trenches. Hydrants under pressure, valve pit covers, valve boxes, curb stop boxes, fire or police call boxes or other utility controls shall be unobstructed and accessible during the construction period.
D. 
Alignment and grade. All construction shall conform to the required lines and grades. No deviation shall be made from the required line or grade except with the written consent of the Engineer. Wherever obstructions not shown on the approved plans are encountered during the progress of the work and interfere to such an extent that an alteration of the line and/or grade is required, the Engineer shall have the authority to order a deviation from the line and grade. If the change in line and/or grade results in work beyond that required by the approved plans, the cost for such additional work shall be at the expense of the applicant. Deviation from the lines and grades shown on the approved plans or established by the Engineer shall be corrected at the expense of the applicant.
E. 
Trenches and other excavations.
(1) 
The trenches and other excavations shall be of sufficient width and depth at all points to allow all pipes to be laid, joints to be formed and structures and appurtenant construction to be built in the most thorough and workmanlike manner, and to allow for sheeting and shoring, pumping and draining, and for removing and replacing any materials unsuitable for foundations. The trenches and excavations shall be at least 18 inches wider than the outside dimensions of the structures they are to contain. The maximum clear width of trench one foot above the top of the pipe shall be as shown on the approved plans. Greater width of trench shall be permitted only upon approval of the Engineer.
(2) 
The depth of trench shall be such that the pipe, when laid on the prepared bed, shall have at least four feet six inches of cover from top of pipe to finished surface grade unless shown otherwise on the approved plans.
(3) 
The excavation for trench shall be carried out at least four inches and not more than six inches below the specified bottom of the pipe. Before the pipe is laid, the trench shall be backfilled to subgrade by backfilling with an approved material, meeting the requirements of § 233-13C(1), Selected material for trench bottom, in four-inch to six-inch compacted layers. The layers shall be thoroughly tamped as directed by the Engineer so as to provide a uniform and continuous bearing and support for the pipe. If the bottom of any excavation has been removed below the six-inch limit without authorization by the Engineer, it shall be filled with an approved material and thoroughly compacted as directed by the Engineer, at the applicant's expense. The subgrade elevation for pipe shall be 15% of the outside diameter of the pipe above the pipe invert elevation, unless otherwise shown on the approved plans, to ensure that the bottom quadrant of the pipe barrel is embedded in the backfilled material. Hand tools shall be used to prepare the subgrade in the areas of the pipe bell.
F. 
Excavation in poor soil and refilling to subgrade. Where the bottom of the excavation is found to be unstable or to include ashes, cinders, all types of refuse, vegetable or other organic material or large pieces or fragments of inorganic material which, in the judgment of the Engineer, should be removed, the applicant shall excavate and remove such unsuitable material to the width and depth ordered by the Engineer. The subgrade shall then be made by backfilling with an approved material, meeting the requirements § 233-13C(1), Selected material for trench bottom, in six-inch compacted layers. The layers shall be thoroughly tamped as directed by the Engineer so as to provide a uniform and continuous bearing and support for the pipe and/or structure. The finished subgrade shall be prepared accurately by means of hand tools.
G. 
Special foundation in poor soil. Where the bottom of the excavation at subgrade is found to consist of material which is unstable to such a degree that, in the opinion of the Engineer, it cannot be removed and replaced with an approved material thoroughly compacted in place to support the pipe or structure properly, the applicant shall construct a foundation for the pipe or structure consisting of piling, timbers or other materials, in accordance with plans submitted by the applicant and approved by the Engineer.
H. 
Rock excavation.
(1) 
The word "rock," wherever used as the name of an excavated material, shall mean solid ledge rock, masonry, concrete and boulders which, in the opinion of the Engineer, require for removal drilling and blasting, wedging, sledging or barring or breaking up with a power-operated hand tool.
(2) 
Rock shall be removed to provide a clearance of at least six inches below and nine inches on each side of all pipe, fitting, manholes and special structures.
(3) 
The specified minimum clearances are the minimum clear distances which will be permitted between any part of the pipe and appurtenances being laid or structures being built and any part, projection or point of such rock, boulder or stone.
(4) 
Where excavation is made in rock or boulders and the clearance specified above is provided, the subgrade shall be made by backfilling with an approved material meeting the requirements of § 233-13C(1), Selected material for trench bottom, in six-inch compacted layers at the applicant's expense. The layers shall be thoroughly tamped as directed by the Engineer so as to provide a uniform and continuous bearing and support for the pipe and/or structures. The finished subgrade shall be prepared accurately by means of hand tools.
(5) 
The hours of blasting shall be fixed by the Engineer. Any damage caused by blasting shall be repaired by the applicant at his expense. The applicant's procedures and methods of blasting shall conform to all laws and municipal ordinances pertaining to blasting for this work.
(6) 
The Code of the Association of General Contractors, the American Manual of Accident Prevention in Construction, must be followed. The applicant, in addition to observing all laws and ordinances relating to the storage and handling of the explosives, shall also conform to any further regulations which the Engineer may deem necessary in this respect.
(7) 
When rock is removed by blasting, it shall be removed at least 30 feet in advance of the laying of pipe or construction of structures. When an existing pipe, conduit or structure intersects or comes within five feet of the line of the trench, any rock necessary to be excavated for a distance of five feet in the clear, on each side of the existing pipe, conduit or structure shall, in all cases, be removed with the utmost care to avoid disturbing the existing pipe, conduit or structure. If the applicant elects to blast, only the lightest of possible explosive charges shall be used. The applicant shall, in all cases, be held responsible for and shall make good any damage caused by blasting, accidental explosions or other rock removal procedures used.
(8) 
Material from rock excavation may be used as backfill only in conformance with the following requirements:
(a) 
The backfill shall not contain stones or rock more than nine inches in their largest dimension, and backfill shall not contain more than 33% rock.
(b) 
All rock shall be uniformly distributed throughout the backfill. Nesting of rocks will not be permitted.
(c) 
Material from rock excavation which is not suitable for backfill, as determined by the Engineer, shall be removed from the site. Suitable backfill material acceptable to the Engineer shall be substituted for the unsuitable rock material. Removal of unsuitable rock excavation material and furnishing and placing of suitable backfill shall be accomplished by the applicant at his expense.
I. 
Excavation methods.
(1) 
The use of trench-digging machinery will be permitted except where its operation will cause damage to trees, buildings or existing structures above or below the ground. At such locations, hand methods shall be employed to avoid such damage. Trenches shall be opened at such times and to such extent only as may be permitted by the Engineer.
(2) 
Where, in the opinion of the Engineer, field conditions do not satisfactorily permit the use of large excavation equipment, the Engineer shall have the right to limit the maximum size or equipment to be used by the applicant.
(3) 
The applicant shall furnish, put in place and maintain such sheeting, shoring and bracing as may be required by all governing state laws and municipal ordinances and as may be necessary to protect life, property or the work. The Engineer may order additional, longer or stronger sheeting, shoring and bracing or different methods where in his opinion the sheeting, shoring and bracing is not satisfactory. Any omission on the part of the Engineer to so order shall not relieve the applicant of his responsibility to provide adequate sheeting, shoring and bracing. When close sheeting is required, it shall be so driven as to prevent adjacent soil from entering the trench either below or through such sheeting. Bracing, shoring and sheeting shall be securely fastened in place so they cannot loosen up and fall or move from position. All expenses for this work shall be paid for by the applicant.
(4) 
Where sheeting and bracing are used, the trench width shall not be less than 18 inches or one foot greater than the outside diameter of the pipe, whichever is greater.
(5) 
The sheeting, shoring, bracing, etc., or parts thereof, shall be left in place after the completion of the work in locations where ordered in writing by the Engineer. The Engineer may require that at intervals the sheeting shall be left in place and that other sheeting be removed. All sheeting which is left in place, whether ordered by the Engineer or left for the convenience of or to subserve the interests of the applicant, shall be cut off at least three feet below the established finished grade or the existing surface of the ground, whichever is lower.
(6) 
Failure to order sheeting left in place by the Engineer shall not relieve the applicant from any responsibility for any loss or danger whatsoever from his lack of leaving sheeting in place on his own initiative.
(7) 
Sheeting, shoring and bracing, except that which has been permitted or ordered to be left in place, may be removed after backfilling has been brought up to such an elevation as to permit its safe removal. As backfill is placed and if sheeting is to be withdrawn, the voids left by the withdrawn sheeting, shoring and bracing shall be filled and compacted.
(8) 
The applicant shall at all times provide ample means and equipment with which to promptly remove and dispose of all water and drainage entering the excavation or other parts of the work and to keep such excavation dry until the pipeline and/or structure to be built therein is completed. In no case will the laying of pipe or building of structures be permitted with water in the excavation.
(9) 
Dewatering methods and equipment shall be adequate to properly dewater the work and shall be subject to the approval of the Engineer, and all water removed from the work shall be disposed of in an approved manner without damage to adjacent property or other work.
(10) 
No tunneling will be permitted in place of open trench excavation unless specifically authorized by the Engineer.
(11) 
All surface materials which, in the opinion of the Engineer, are suitable for reuse in restoring the surface shall be kept separate from the general excavation materials, directed by the Engineer. All excavated material shall be piled in a manner that will not endanger the work or limit free access to any part of the work. Gutters shall be kept clean, or other satisfactory provisions shall be made for street and other drainage. Precautions shall be taken to maintain access to all valve boxes, manholes and fire hydrants. Excess material shall be disposed of by the applicant at his expense.
J. 
Pipe laying.
(1) 
Proper implements, tools and facilities satisfactory to the Engineer shall be provided and used by the applicant for the safe and convenient prosecution of the work. All pipe shall be carefully lowered into the trench piece by piece by means of a derrick, ropes or other suitable tools or equipment, in such a manner as to prevent damage to the materials and protective coatings or linings. Under no circumstances shall materials be dropped or dumped into the trench. Pipe and fittings shall be carefully cleaned with a dry cloth to remove all sand, mud, clay, oil or ice so as to be left clean and dry. Every precaution shall be taken to prevent foreign material from entering the pipe while it is being placed in the line. During the laying operations, no debris, tools, clothing or other materials shall be placed in the pipe. At other times, the pipe shall be closed by a watertight plug or other means approved by the Engineer. This provision shall apply during the noon hour as well as overnight. If water is in the trench, the seal shall remain in place until the trench is pumped completely dry. No pipe shall be laid in water or when, in the opinion of the Engineer, trench conditions are unsuitable.
(2) 
All pipe shall be laid uphill with the bell, socket or coupling ends facing the direction of laying. Preparation of the trench bottom and placement of the pipe shall be carefully made so that, when in final position, the pipe is true to line and grade, carefully centered, with a uniform invert.
(3) 
Concrete reaction blocking shall be poured at all fittings, dead ends, trees, crosses, etc. The blocking shall bear uniformly on undisturbed soil in the direction of thrust. The sizes of reaction blocking shall be as shown on the approved plans or as designated by the Engineer.
K. 
Bedding of pipe. The pipe shall be bedded as shown on the approved plans or as directed by the Engineer, in accordance with the following requirements:
(1) 
Bedding on selected material. Unless otherwise shown on the approved plans or permitted by the Engineer, the bottom of the trench, after the selected material for the trench bottom has been placed and compacted, shall be shaped to receive the bottom quadrant of the pipe barrel. In addition, bell holes shall be excavated so that after placement only the barrel of the pipe received uniform bearing pressure from the trench bottom.
(2) 
Concrete encasement and concrete cradles. Pipes encased in concrete or supported by a concrete cradle shall be temporarily supported, by means of precast or poured-in-place concrete blocks or bricks, on the prepared bottom of the trench or excavation. Temporary supports shall have minimum dimensions and shall support the pipe at not more than two locations, one adjacent to each end of each length of pipe. After jointing of the pipe has been completed, concrete shall be placed to provide support for at least the bottom quadrant of the pipe. For pipe encasement, sufficient concrete shall be used so that the encasement is at least four inches thick at all points. The concrete shall be of such consistency as to permit its flow, without excessive rodding, to all required points around the pipe surface. Unless otherwise shown on the approved plans or required or permitted by the Engineer, the width of cradle shall be such as to fill the trench width completely. In no case shall the width of cradle be less than 12 inches greater than the diameter of the pipe at the outside of the bell or socket. The placing of the concrete shall be done in such a manner that the grade and alignment of the pipe will not be disturbed. Special provisions shall be taken to prevent flotation of the pipe during placement of the concrete.
L. 
Jointing.
(1) 
In general, the method and materials to be used in jointing the pipe shall follow the recommendations of the pipe manufacturer. Prior to the start of the work, pipe layers shall be instructed by a representative of the pipe manufacturer in the proper method to be used, and the applicant will see that these methods are followed.
(2) 
Preparatory to making pipe joints, all surfaces of the portions of the pipe to be jointed or of the factory-made jointing material shall be clean and dry. No jointing of the pipes will be permitted in a wet trench or other excavation. Gaskets, lubricants, primers, adhesives, etc., shall be installed and used as recommended by the pipe or joint manufacturer's specifications. Gaskets and other jointing materials shall be protected from damage at all times. Gaskets and jointing materials shall be inspected before installation of the pipe, and any loose or improperly affixed gaskets and jointing materials shall be removed and replaced to the satisfaction of the Engineer. The pipe shall be aligned with the previously installed pipe, and the joint put together. Immediately after the pipes are put together, the position of each gasket and joint shall be inspected to be sure that the joint has been properly made and is tight. If, while making the joint, the gasket or jointing material becomes loose or misplaced, the pipe shall be removed and the joint remade to the satisfaction of the Engineer.
(3) 
The joints shall be made in a workmanlike manner so as to obtain the degree of watertightness required.
(4) 
If a pipe joint is made by pushing against the opposite end of the entering pipe, using a metal bar or other means, the end of the pipe shall be protected with a block of wood to distribute the stresses and prevent damage to the pipe.
M. 
Setting valves.
(1) 
Valves shall be located and set where shown on the approved plans. Valve clusters at intersections shall be set symmetrically and as close together as is practical.
(2) 
Valves and boxes shall each be set and maintained in a vertical position. The position of the nut inside the box shall be such that free and complete access to the nut can be achieved with the wrench.
(3) 
The finished elevation of the top of the valve box shall be such that the top is level with the surrounding pavement. In the case of incompleted streets or roads, the upper box section shall be set as close as possible to the theoretical grade of the finished street surface and the valve or valve cluster protected by barricade, barrels or other markers satisfactory to the Engineer.
N. 
Hydrants.
(1) 
Hydrants shall be located and set approximately where shown on the approved plans or as ordered and directed by the Engineer. Hydrants shall be connected to the main by the necessary length of six-inch ductile iron pipe. All joints shall be mechanical joint with retainer glands installed in accordance with manufacturer's instructions. Hydrant valves shall be located as shown on the typical section on the approved plans or two feet six inches from the hydrant center line.
(2) 
The hydrant shall be set on a solid base, and concrete reaction blocking shall be poured around the base bearing on virgin soil, taking care to keep the drain hole unobstructed. The remainder of the base shall be packed with coarse gravel or crushed stone to permit drainage of the hydrant barrel.
(3) 
The hydrant shall be so placed that the distance from the nut of the pumper connection to the finished ground elevation shall be 18 inches to 21 inches. Extension sections shall be used only where unknown or unusual field conditions are encountered. The applicant shall provide hydrants with various depths of bury so the hydrants may be installed to the proper elevation without extensions.
O. 
Service connections.
(1) 
Services shall be installed in conformance with the requirements heretofore specified for excavation, pipe laying, bedding of pipe, jointing, backfilling and testing and/or in conformance with local municipal plumbing codes.
(2) 
Minimum cover for service pipe shall be four feet six inches unless shown otherwise on the approved plans.
(3) 
The service pipe shall terminate with a curb stop and box which shall be set so that the top of box will be four inches to six inches above finished grade and adjacent to the user's property line. The curb box shall be adjustable to the flush position.
(4) 
Before backfilling, the corporation stop shall be turned to the "on" position.
(5) 
Service pipe and appurtenances shall be included in and subject to the hereinafter-specified test for pressure, leakage and contamination.
P. 
Backfilling.
(1) 
Upon completion of the laying of pipe, backfilling will be started immediately and shall be continued so that at the end of the working day all pipe is completely backfilled. Selected material for trench bottom shall be placed continuously by hand in layers not exceeding six inches in thickness after compaction and thoroughly consolidated by tamping simultaneously on both sides of the pipe to a minimum height of 12 inches above the top of the pipe and to such additional height as may be shown on the approved plans.
(2) 
The remainder of the trench shall be backfilled to the full height of the trench or to the elevations shown on the approved plans as follows:
(a) 
Where trenches and other excavation are located in roadways, sidewalks or driveways or under curbing or other utilities, the backfill shall consist of run-of-trench materials placed in layers not to exceed 12 inches and compacted by mechanical tampers. The top 12 inches of the backfill shall be gravel fill meeting the requirements hereinbefore specified. If, in the opinion of the Engineer, the trench materials are not usable as compactible backfill, on his order, it shall be disposed of and the backfill made in part or entirely with gravel fill compacted as described above.
(b) 
At all other locations, unless specifically shown or required otherwise by the approved plans, the backfill shall be made as above, except that the top 12 inches of backfill shall be similar to that excavated unless ordered otherwise by the Engineer.
(c) 
The surfaces of all backfilled areas shall be maintained through final consolidation so that the backfilled areas remain consistently on grade with the surrounding undisturbed surfaces.
(3) 
Where shown on the approved plans, the applicant shall place fill to form a protective embankment over the pipe. This fill shall conform to the dimensions and elevations shown on the approved plans.
(4) 
Any deficiency in the quantity of material for backfilling the trenches or construction embankments over the pipe or filling any depressions caused by settlement shall be supplied by the applicant at his own expense. Backfill material in rock excavations shall be included in this category. The applicant shall not permit the excavated trench or any portion thereof to be used for disposal of rubbish, and all backfill shall be free from cinders, ashes, organic material or other material which, in the opinion of the Engineer, is unsuitable.
(5) 
Backfilling around appurtenances and special structures shall be made as specified above for pipe. No backfill shall be placed against masonry structures until, in the opinion of the Engineer, the concrete or mortar has had sufficient time to harden and cure. Backfill shall be placed evenly to the same height on all sides of the structure in order to avoid unbalanced lateral loading on the structure.
(6) 
Backfilling shall not be done in freezing weather except by permission of the Engineer, and it shall not be made with frozen material. No backfill shall be made where the material already in the trench is frozen. Compaction of all backfill and fills shall be completed to the full satisfaction of the Engineer.
(7) 
The specifications for backfill as detailed above are considered to be minimum. The applicant shall assume full responsibility for the preservation of the work and the structural integrity of the pipe and appurtenances. He shall also assume full responsibility for trench settlement during the construction period and the guaranty period. In the event of trench settlement, he shall do the required backfill, grading and/or replacement of paving to restore the prescribed surface elevations.
Q. 
Testing.
(1) 
During the progress of construction and/or upon completion of the same, pressure, leakage and disinfection tests shall be made on the pipe and appurtenances.
(2) 
Pressure and leakage tests shall be performed on sections between valves of not more than 1,500 feet in length. All equipment and labor for the hydrostatic test will be provided by the applicant. Tests will be made at average pressure of 150 pounds per square inch for a duration of two hours unless otherwise ordered by the Engineer. Initial pressure shall be 175 pounds per square inch.
(3) 
Allowable leakage shall be determined by the formula:
Where
  L = Allowable leakage in gallons per hour.
  N = Number of joints in the length of pipe tested.
  D = Nominal diameter of pipe in inches.
  P = Average test pressure during leakage test in pounds-per-square-inch gauge.
(4) 
The section to be tested shall be slowly filled with water and the specified pressure applied by pump. Air shall be expelled from the pipe through user services or hydrants or through taps made as may be necessary by the applicant.
(5) 
The section under initial specified pressure shall be allowed to sit for a period of two hours or as ordered by the Engineer. At no time during the test period shall the pressure be allowed to diminish by more than 50 pounds per square inch from the initial pressure. In the event that the pressure is reduced by more than 50 pounds per square inch, the line shall immediately be repumped to the initial pressure. At the end of the period or periods, the pressure shall be restored to the initial pressure, and the amount of water necessary to do so shall be measured to determine the leakage each time the line is repumped. The total water used during the two-hour test shall determine the leakage.
(6) 
Pressure tests shall be made after the backfill is completed but not sooner than five days after the pouring of concrete thrust blocking.
(7) 
All parts of the work, including hydrants and user services, shall be included in the pressure, leakage and disinfection tests.
(8) 
Before being placed in service and before certification of completion by the Engineer, the entire work shall be disinfected in accordance with the methods prescribed in the AWWA Standard C-601 and/or as follows:
(a) 
A disinfectant mixture which will provide 50 parts per million minimum available chlorine shall be introduced into the system and retained for at least 12 hours. The system shall be then drained and flushed. Bacteriological examination of water samples, collected after disinfection, shall be made by the Health Department at the applicant's expense. Samples shall be taken at various points on the system as determined by the Health Department. If examination determines that the water is unfit for consumption, the disinfection process shall be repeated until potable samples are achieved.
(b) 
It is the responsibility of the applicant to provide a complete system free from contamination.
(9) 
The applicant shall furnish at his own expense an adequate supply of all water required during the construction and testing of the system, paying for the expenses and charges for the same, and installing and paying for a meter if it is required. When work is completed, temporary water connections and fixtures shall be removed by the applicant and all unused taps shall be plugged.
R. 
Cleaning up.
(1) 
As the work progresses, the applicant shall clean up the streets and rights-of-way, and the backfill shall be rounded within the limits of the excavation. Soft trenches shall be marked and protected with signs and adequate lights, and subsequent settlement shall be promptly refilled.
(2) 
All backfilled trenches and surrounding areas of work in progress shall be maintained as clean and dust-free as practical, as determined by the Engineer. Water, calcium chloride, mechanical sweepers or other means as may be required shall be employed by the applicant to satisfy the Engineer.
(3) 
If within three days, upon receiving a written notice from the Town or the Engineer, the applicant has not met the conditions of Subsection R(2) above, the Town may clean, wet down, sweep, etc., the areas involved and backcharge the applicant.
(4) 
Upon the completion of the work, all dirt and rubbish shall be hauled to a dump provided by the applicant and the construction site left clean to the satisfaction of the Engineer. All surplus materials furnished by the applicant and all tools and temporary structures shall be removed from the site by the applicant.
S. 
Restoration and maintenance of pavement, damaged surfaces and property.
(1) 
The applicant shall restore or replace all removed or damaged paving, curbing, sidewalks, gutters, shrubbery, grass, fences, sod or other disturbed surfaces or structures in a condition equal to that before the work began and to the satisfaction of the Engineer and shall furnish all labor and material incidental thereto. In restoring improved surfaces, new pavement shall be laid, except that granite paving blocks, sound brick or sound concrete paving blocks may be reused.
(2) 
Pavement replacement shall be made in accordance with the requirements of other sections of the approved plans and in accordance with the specifications and directions of state, county or Town authorities having jurisdiction over the pavement.
(3) 
After the certification by the Engineer of the completion of the work, the applicant shall, unless it is otherwise specified in the approved plans, maintain the surface of unpaved trenches and adjacent curbs and gutters, sidewalks, shrubbery, fences, sod and other disturbed surfaces for a period of three months thereafter. The applicant shall maintain, for one year after certification of completion, areas that have been repaved and curbs, gutters and sidewalks that have been replaced, unless otherwise specified in the approved plans or required by state, county or Town officials having jurisdiction. All material and labor required for the maintenance of the trench surfaces and structures shall be supplied by the applicant, and the maintenance shall be done in a manner satisfactory to the Engineer.
A. 
All buildings shall be constructed in accordance with the New York State Uniform Fire Prevention and Building Construction Code and Energy Code.
B. 
All supply systems shall be constructed and tested in accordance with plans and specifications approved by the Dutchess County Department of Health.
C. 
All buried piping shall be constructed in accordance with §§ 233-12, 233-13 and 233-14 of these rules and regulations.
D. 
Wells. The Engineer shall be notified prior to any well pump tests. Whenever two or more wells are located in a common well field or within 500 feet of one another, all wells, including any existing wells in the well field, shall be tested simultaneously. All well pumping tests shall be continuous over a forty-eight-hour period unless required otherwise by the Engineer. The rated capacity of the new well or wells shall be the minimum flow recorded during the forty-eight-hour test period. The drawdown and the stabilized flow shall be recorded hourly.
E. 
The applicant shall submit to the Town a completed works approval from the New York State Department of Health prior to acceptance of the system by the Town.
As mandated by the New York State Health Department, the separation between sewer and water lines shall conform to one of the following:
A. 
Each line shall be laid in a separate ditch.
B. 
Each line shall have a horizontal separation of 10 feet if laid in the same ditch.
C. 
The lines shall be benched 18 inches, with the sewer being the lower of the two, and a minimum horizontal separation of two feet.[1]
[1]
Editor's Note: The following articles of original Ch. 98, which immediately followed this subsection, were repealed 12-11-1985 by L.L. No. 4-1985: Art. III, Noxon Knolls Water District, adopted 1-23-1980 by L.L. No. 2-1980, as amended; and Art. IV, Titusville Water District, adopted 5-12-1980 by L.L. No. 6-1980, as amended.