Exciting enhancements are coming soon to eCode360! Learn more 🡪
Village of Ossining, NY
Westchester County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Amended 12-2-1980 by L.L. No. 7-1980; 12-15-1981 by L.L. No. 9-1981; 5-5-1992 by L.L. No. 7-1992; 8-3-1999 by L.L. No. 2-1999; 4-19-2017 by L.L. No. 3-2017; 10-7-2020 by L.L. No. 3-2020]
[1]
Editor's Note: The Schedule of Fees is on file in the Village offices.
No permit required under the Uniform Code accepted by this chapter or other provisions of this Code relating to buildings or structures shall be issued nor any application accepted until the fee prescribed in this article shall be paid. In the event that a lower or different fee is prescribed in any other code, law or resolution, the fee prescribed in this article shall be paid.
For each addition, alteration, new building or structure, fees shall be as set from time to time by the Board of Trustees.
For the demolition of any building or structure (except temporary buildings or structures), the fee shall be as set from time to time by the Board of Trustees for each building to be demolished.
For moving of a building or structure from one lot to another, the fee shall be at the rate set from time to time by the Board of Trustees.
For each installation of a sign, the permit fee shall be as set from time to time by the Board of Trustees.
For each installation of an awning or marquee, upon the Board's approval, the fee shall be as set from time to time by the Board of Trustees.
For each installation of a fire escape, the fee shall be set from time to time by the Board of Trustees.
For each heating system (not heating units), standpipe, sprinkler, elevator, or refrigeration installation, including hot-air heat and central air-conditioning systems, the installation permit fee shall be as set from time to time by the Board of Trustees.
For each certificate of occupancy, the fees shall be as set from time to time by the Board of Trustees.
Permit fees for electrical work shall be as set from time to time by the Board of Trustees.
The fees for new construction or alterations of heating work shall be as set from time to time by the Board of Trustees.
The fees for new construction or alteration of plumbing work shall be as set from time to time by the Board of Trustees.
For each tie-in to the Village sewer main, regardless of pipe size, a fee shall be charged as set from time to time by the Board of Trustees.
Blasting permit fees shall be as set from time to time by the Board of Trustees.
Codes and maps shall be made available upon payment of fees set from time to time by resolution of the Village Board of Trustees.
Fees for PRD approval shall be set from time to time by resolution of the Village Board of Trustees.