Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Barnstable, MA
Barnstable County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Adopted 11-8-1977, effective 11-29-1977 (Section 3.00 of Part VIII of the 1991 Codification as updated through 6-1-1996)]
[Amended 12-10-2013]
Permits for on-site sewage disposal or water supply may be approved for construction when located within Zones A and V as designated on the most up-to-date FIRM Flood Insurance Rate Map on file with the Building Commissioner, when it is demonstrated by the applicant that in the event of flooding to base elevations, such facilities are designed to minimize contamination.
Any new or replacement water supply system or sanitary sewerage system within such area shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the system into floodwaters.
The applicant shall also comply with all provisions of the Massachusetts Department of Environmental Quality Engineering, Title V, and all Town of Barnstable health regulations.