A.
The contractor shall furnish all materials, perform all excavation and backfill, make all necessary joints and connections, install all valves, construct all appurtenances, install all temporary lines and dispose of all surplus excavation and discarded material and perform all work as may be necessary to complete the force main installation as set forth in these specifications.
B.
The contractor shall notify all corporations, companies, individuals or authorities owning conduit, wires or pipes located within proximity of the proposed force mains or encountered during excavating operations. The contractor shall protect, support and maintain all conduits, drains, sewers, pipes and wires that are to remain in place.